Bretford MSB-F2 Скачать руководство пользователя страница 2

Substation

Substation

parts removed

for clarity

Floor

monument

Infeed

Infeed
open end

Junction Box

Substation
skin open
position

The open end of  the Infeed is to be installed by a certified electrician.
Will require cover plate to have 1 1/8” knock out and an appleton 7289v
connector to complete connection.

STEP 1

Plug the other end of  the Infeed into the Junction Box. Close the
Substation Skins.

Fig. 1

Steps to connect Floor Infeed to Junction Box

Note 2. :

Substation Channel instruction sheet step 1 thru step 3 must be completed before
wiring can be done.

Note 1. :

Отзывы: