background image

5

022-3182

     1x

030-0291

     4x

030-0291

8 of 25

Содержание DIWB

Страница 1: ...ector Mount Support 060 0952 Qty 1 Lifting Handle Assembly 030 1545 Qty 1 White Board 010 6120 Qty 1 Board Retention Bracket 017 1232 Qty 1 Guide Tube 022 3331 Qty 1 Projector Slide Assembly 060 0926...

Страница 2: ...Black Vinyl Cap 012 0696 Qty 2 1 Knurled Knob 030 0240 Qty 2 1 4 Lockwasher 030 1569 Qty 2 Foam Pad 030 1571 Qty 4 1 Square Black Foam 030 1621 Qty 2 Foam Pad 030 0272 Qty 2 1 4 20 x 1 2 Carriage Bol...

Страница 3: ...1 LOCK LOCK LOCK 022 3188 1x 015 0176 4x 3 of 25...

Страница 4: ...2 Correct Position Faces shorter side 030 0538 030 0207 030 0538 8x 030 0207 8x 022 3187 1x 4 of 25...

Страница 5: ...3 030 0538 030 0207 030 1546 1x 030 0538 1x 030 0207 1x 5 of 25...

Страница 6: ...4 022 3312 1x Correct Position 6 of 25...

Страница 7: ...030 0538 030 0207 030 0207 1x 030 0538 1x 7 of 25...

Страница 8: ...5 022 3182 1x 030 0291 4x 030 0291 8 of 25...

Страница 9: ...ector Attach the bracket to the monitor as shown You will use the following hardware Bolt 030 1695 Washer 030 1397 Nut 030 0159 The bolt and washer will go on top of the bracket and the nut goes under...

Страница 10: ...h your porjector 030 1397 4x 030 1398 May not be necessary with your projector Attach projector to slide assembly 022 3331 1x FRONT OF PROJECTOR MUST FACE THIS DIRECTION ON SLIDE ASSEMBLY 030 1657 4x...

Страница 11: ...8 017 1232 1x 022 3331 1x Projector removed for clarity INSTALLING THIS ASSEMBLY REQUIRES 2 PEOPLE 11 of 25...

Страница 12: ...030 0538 030 0207 030 0207 3x 030 0538 3x Flange sits on top of tube Projector removed for clarity 12 of 25...

Страница 13: ...9 Board 030 1545 1x Position in rail 13 of 25...

Страница 14: ...010 6120 1x Front View Back View 030 0962 2x BOARD MUST BE CENTERED Slide board back and forth to center 030 0962 Center notch on tray 14 of 25...

Страница 15: ...10 060 0926 1x 030 1026 2x 030 0207 2x 030 0207 030 1026 Note Can be mounted to either side of cart Best to mount on the same side cables plug into your projector 15 of 25...

Страница 16: ...11 030 1267 4x 030 0845 4x These are the main tension screws They control the pitch movement of the vesa joint Adjust carefully 16 of 25...

Страница 17: ...12 012 0692 2x 030 1571 2x 010 6228 2x 17 of 25...

Страница 18: ...13 030 1569 2 x 030 1621 2 x 18 of 25...

Страница 19: ...012 0696 2x 030 0240 2x 030 0272 2x 030 1571 2 x 19 of 25 NOTE Before attaching the square foam pieces decide where you are going to mount the outer brackets Then proceed with attaching the foam squar...

Страница 20: ...ttaching the cable to the cylinder be very careful not to pull up on the lever By doing this it may cause the cylinder to spring up Hook end of cable onto cylinder Slide in place 20 of 25 030 1611 Cab...

Страница 21: ...010 6127 1x 16 21 of 25...

Страница 22: ...17 Slide cable through hole in handle assembly 22 of 25...

Страница 23: ...18 Slide cable through eye lit hole and slide it to the left 23 of 25...

Страница 24: ...19 With pliers pull the cable through the next handle piece so that it sits in the narrow part of the eyelit hole 24 of 25...

Страница 25: ...tford Ltd 11000 Seymour Avenue 2 Etongate Franklin Park IL 60131 110 Windsor Road Slough TEL 847 678 2545 Berkshire SL1 2JA England 800 521 9614 TEL 011 44 17 5353 9955 FAX 847 678 0852 FAX 011 44 17...

Отзывы:

Похожие инструкции для DIWB