07
-
2011
-
Rev.00
6.
22
Part 6 Operations
•
Rise the drywall panel as showed in fig1
•
Rise the Platform at the desidered height (fig2)
•
Fix the drywall panel at the wall.
•
Lower the platform at the minimum height
•
Repeat the procedure
Due to the fact the Solo Gyps drywall panel hoist is electrically connected to the Platform batte-
ries check during operations the top control battery gauge in order to verify the battery charge
level.
09
-
2020
-
Rev 00