Page 11
Maintenance and Lubrication Schedule
Maintenance and
lubrication procedures
must be performed as
speci
fi
ed by an
authorized service
technician. Failure to
do so may result in
serious bodily injury
and/or property
damage.
Proper maintenance is necessary to ensure safe,
troublefree operation. Inspecting the lift for any wear,
damage or other abnormal conditions should be a part
of all transit agencies’s daily service program. Simple
inspections can detect potential problems.
The maintenance and lubrication procedures speci
fi
ed
in this schedule
must
be performed by a Braun autho-
rized service representative at the scheduled intervals
according to the number of cycles.
Braun dual parallel arm lifts are equipped with hard-
ened pins and self-lubricating bushings to decrease
wear, provide smooth operation and extend the service
life of the lift.
When servicing the lift at the recommended intervals,
inspection and lubrication procedures speci
fi
ed in
the previous sections should be repeated.
Clean
the
components and the surrounding area
before apply-
ing lubricants
. LPS2 General Purpose Penetrating
Oil is recommended where Light Oil is called out.
Use of improper lubricants can attract dirt or other
contaminants which could result in wear or damage
to the components. Platform components exposed to
contaminants when lowered to the ground may require
extra attention.
Lift components requiring grease are lubricated during
assembly procedures. When these components are
replaced, grease must be applied during installation
procedures. Speci
fi
ed lubricants are available from
The Braun Corporation (part numbers provided on
previous page).
All
listed inspection,
lubrication and main-
tenance procedures
should be repeated at
“750 cycle” intervals
following the scheduled
“4500 Cycles” mainte-
nance. These intervals
are a general guideline
for scheduling mainte-
nance procedures and
will vary according to
lift use and conditions.
Lifts exposed to severe
conditions (weather,
environment, contamina-
tion, heavy usage, etc.) may require inspection and
maintenance procedures to be performed more often
than speci
fi
ed.
Cycle Counter:
NCL-2 Series lift models are equipped
with a cycle counter located on the top of the pump
module. This cycle counter allows the lift attendant/op-
erator to easily track the number of cycles during daily
inspections of the lift.
Discontinue lift use immediately
if maintenance and
lubrication procedures are not properly performed, or if
there is any sign of wear, damage or improper opera-
tion. Contact your sales representative or call The
Braun Corporation at 1-800-THE LIFT
®
. One of our
national Product Support representatives will direct you
to an authorized service technician who will inspect your
lift.
Outer barrier pivot points (2)
Outer barrier latch pivot points (2)
Outer barrier switch lever pivot point
Outer barrier latch roller bearing (2)
Outer barrier gas springs (2 springs - 4 points)
Gear link assembly bearings (4)
Gear link assembly teeth (2)
Outboard platform bearings (2)
Platform fold link bearings (4)
Platform fold gear rack bearings (4)
Platform fold gear rack teeth (2)
Lift-Tite
™
latches (tower pivot points - 2)
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Door Ease - See Lubrication Diagram
Apply Light Grease - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Grease - See Lubrication Diagram
Apply Door Ease - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
750
Cycles
WARNING
continued
Содержание NVL Vista 2 Series
Страница 11: ...Page 9 NOTES This page intentionally left blank...
Страница 32: ...Page 30 NOTES This page intentionally left blank...