6
Remove
Junction Box
Cover
Installation Instructions
•
Do not over tighten 90° elbow, water valve bracket
could bend or water valve fitting could break.
•
Position the end of the elbow to face the bottom
dishwasher.
STEP 5 INSTALL 90° ELBOW
•
Wrap 90° elbow with thread seal tape.
Do not use
plumber's putty.
•
Install a 90° elbow onto the water valve.
STEP 3 REMOVE TOEKICK
• Remove the 2 toekick screws. Lift off the piece
toekick.
•
Measure installation height and dishwasher height.
Extend leveling legs out from the dishwasher base,
1/4" less than installation height.
STEP 2 ADJUST LEVELING LEGS
•
Move the dishwasher close to the installation loca-
tion and lay it on its back.
STEP 4 INSTALL POWER CORD
Skip this step if dishwasher will be direct wired.
Use
power cord kit WX09X70910 available for purchase fro
m
an authorized GE
ealer. The power cord and
connections
m
ust co
m
ply with local codes and
ordinances.
• Recommended power cord length is 54" min. and
64" max.
Adjust
Installation
Height
• Connect incoming
power cord white (or ribbed)
to dishwasher white, black
(or smooth) to black and ground to dishwasher green
wire. Use
UL listed wire nuts of appropriate size.
• Replace junction box cove
r. Be sure wires are not
pinched under the cover.
Green wire to Green wire ( Ground)
Black wire to Black wire ( Hot)
White wire to White wire ( Neutral)
parts d
cUL/
of the
right
1
Содержание BR-DWSH01-S
Страница 6: ...Increase Increase Increase Decrease Decrease Decrease...
Страница 8: ......