Bradley WC7180 Скачать руководство пользователя страница 4

WC7180

Installation

4

7/15/09

Bradley Corporation • 215-326 Rev. G; EN 08-705

Installation

NOTE: Back supply is shown, top supply is similar.

Insert six 1/2"-13 threaded 
studs (provided by the 
installer) into the back of 
the unit and screw in 
approximately 1/2".

A

BACK SUPPLY: Connect the 
flush valve supply pipe to the 
1-1/2" NPT inlet half coupling 
on the back of the unit.

TOP SUPPLY: Connect the 
flush valve supply pipe to the 
1-1/2" NPT inlet half coupling 
on the top of the unit.

B

Slide the studs and pipe through the wall 
openings and position the unit into place.

Secure the unit to the wall using the nuts 
(110-119), washers (142-002AM) and 
brackets (140-277) provided. Fasteners 
must be securely tightened to 60 ft. lbs.

C

Connect the drain 
pipe to the waste 
fitting on the back 
of the unit.

D

Содержание WC7180

Страница 1: ... accounted for before discarding any packaging material If any parts are missing do not begin installation until you obtain the missing parts Before installing components all connection supply lines must be flushed and free of foreign material such as pipe dope chips solder etc Bradley will not be responsible for leaking valves due to the presence of foreign material or distorted stop gaskets wher...

Страница 2: ...ley Corporation 215 326 Rev G EN 08 705 Dimensions 14 356mm 14 3 4 375mm 22 3 4 578mm FINISHED FLOOR 5 18 457mm 3 4 19mm STANDARD INTEGRAL SEAT HEIGHT IS 17 432mm OPTIONAL PLASTIC SEAT HEIGHT IS 18 1 2 470mm TO TOP OF PLASTIC SEAT 127mm ...

Страница 3: ...TOLIET SEAT FIXTURE MOUNTING WITH SLEEVE 10 254mm 3 76mm 8 203mm SQUARE 4 102mm SQUARE 7 8 22mm DIA 6 HOLES 20 508mm WALL OPENING 2 51mm FINISHED FLOOR FINISHED FLOOR 6 152mm 12 305mm 18 1 2 470mm 13 1 4 337mm 18 1 2 470mm 13 1 4 337mm 7 178mm 41 1041mm 11 279mm 13 1 4 337mm 5 127mm 5 1 4 133mm FINISHED FLOOR Back Supply 1 1 2 38mm Dia for Mech Push Button 2 51mm Dia for Hyrdaulic or TouchTime Pus...

Страница 4: ...e supply pipe to the 1 1 2 NPT inlet half coupling on the back of the unit TOP SUPPLY Connect the flush valve supply pipe to the 1 1 2 NPT inlet half coupling on the top of the unit B Slide the studs and pipe through the wall openings and position the unit into place Secure the unit to the wall using the nuts 110 119 washers 142 002AM and brackets 140 277 provided Fasteners must be securely tighte...

Страница 5: ...ective coating the helps prevent future smears and fingerprints Grease and Oil To remove grease and oil use a quality commercial detergent or caustic cleaner Apply in accordance to the manufactures instructions and in the direction of the polish lines Precautions Avoid prolonged contact with chlorides bleaches salts bromides sanitizing agents thiocyanates pesticides photography chemicals and some ...

Отзывы: