Bradley S19-879EXP2A Скачать руководство пользователя страница 2

2

S19-879EXP2A, S19-879EXP2B

 

Installation

11/19/08 

Bradley Corporation • 

215-1652; ECN 08-502

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 
proper operation. This equipment should be inspected annually to ensure compliance 
with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per ANSI 
Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and parts information may also be found under ”Products” on our 
web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Содержание S19-879EXP2A

Страница 1: ...115V and 230V versions Classe 1 Division 2 Voyant Lumineux anti déflagrant inclut les versions 115V et 230V Clase 1 División 2 Luz indicadora a prueba de explosiones incluye las versiones de 115V y 230V Table of Contents Pre Installation Information 2 Indicator Light Components 3 Installation 4 Table des matières Avant l installation 5 Eléments 7 Installation 7 Contenido Información previa a la in...

Страница 2: ...fy proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Product w...

Страница 3: ... Proof Indicator Light S19 879EXP2A 115V Rated Class 1 Division 2 Groups C and D Nipple 269 1582 Black White Dual Indicator Lamps with Box 269 1929 Black Green Green Red Red White Nipple 269 1582 Dual Indicator Lamps with Box 269 1930 Explosion Proof Indicator Light S19 879EXP2B 230V Rated Class 1 Division 2 Groups C and D ...

Страница 4: ...r light The indicator light may be mounted directly to the unit junction box at one of the locations shown below 2 Connect the indicator light to the junction box following the wiring diagram Unit Junction Box Heat Trace Drench Shower Recommended mounting locations for S19 879EXP2A and S19 879EXP2B Indicator Lights Green White Black Power Indicator Light Ground Screw in Junction Box Heat Trace Cab...

Страница 5: ... dates d inspection Ce matériel doit être inspecté une fois par an pour assurer sa conformité à la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des matières potentiellement dangereuses doivent recevoir une formation sur la mise en place et le bon fonctionnement du matériel d urgence conformément à la norme ANSI Z358 1 Pour toute question concernant le fonctionnement ou l in...

Страница 6: ... Voyant Lumineux Antidéflagrant S19 879EXP2A 115V Classe 1 Division 2 Groupes C and D Raccord 269 1582 Noir Blanc Boîte de Voyant Lumineux 269 1929 Noir Vert Vert Rouge Rouge Blanc Raccord 269 1582 Boîte de Voyant Lumineux 269 1930 Voyant Lumineux Antidéflagrant S19 879EXP2B 230V Classe 1 Division 2 Groupes C and D ...

Страница 7: ...n Fournitures recommandées pour l installation Ruban téflon tape ou produit d étanchéité pour tuyaux Fil noir blanc et vert calibre 14 AWG pour raccorder le voyant lumineux à l alimentation électrique Écrou de fil Étape 1 Installer le voyant lumineux sur l unité 1 Choisir un emplacement pour l installation du voyant lumineux Le voyant lumineux peut être installé directement sur la boîte de jonctio...

Страница 8: ...e inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que puedan tener contacto con materiales potencialmente peligrosos deben recibir capacitación sobre la ubicación y operación adecuada de los equipos de emergencia en conformidad con la norma ANSI Z358 1 P...

Страница 9: ...a a Prueba de Explosiones S19 879EXP2A 115V Clase 1 División 2 Grupos C y D Niple de Union 269 1582 Negro Blanco Caja de la Luz Indicadora 269 1929 Negro Verde Verde Rojo Rojo Blanco Caja de la Luz Indicadora 269 1930 Luz Indicadora a Prueba de Explosiones S19 879EXP2B 230V Clase 1 División 2 Grupos C y D Niple de Union 269 1582 ...

Страница 10: ...rse directamente en la caja de conexiones de la unidad en cualquiera de las ubicaciones que se muestran 2 Conectar la luz indicadora a la caja de conexiones siguiendo el diagrama de cableado que se ofrece Caja de la unidad de conexiones Ducha de aspersión con control térmico Puntos de montaje recomendados para las luces indicadoras S19 879EXP2A y S19 879EXP2B Verde Blanco Negro Energía eléctrica L...

Отзывы: