background image

2

S19-460

 

Installation

4/28/08 

Bradley Corporation • 

215-169 Rev. T; ECN 08-507

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly 
to verify proper operation. This equipment should be inspected annually to ensure 
compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per 
ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Installation

Supplies Required:

•  1/2" NPT water supply

•  Backfl ow prevention device as required by UPC, IPC and/or local plumbing codes

Step 1: Prepare deck for installation

1.  Rough-in 1/2" NPT supply piping from wall where drench hose is desired (piping supplied by installer).

2.  Select desired location in deck for drench hose and drill a 1-5/16" (34mm) diameter hole.

3.  Install the drain plug using the washers and locknut provided (refer to page 3).

Step 2: Assemble eye/face/body wash

1.  Assemble the eye/face/body wash components as shown on page 3.

•  Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.

Step 3: Connect water supply

1.  Connect the water supply piping (supplied by installer) to the unit. 

2.  Open the water supply lines and test for leaks and adequate water flow.

Содержание S19-460

Страница 1: ...ile pour dessus de comptoir Manguera rociadora de mano para montaje sobre mostrador Table of Contents Pre Installation Information 2 Installation Instructions 2 Assembly of Components 3 Parts List 3 T...

Страница 2: ...ct warranties and service parts information may also be found under Products on our web site at www bradleycorp com Installation TH IS SIDE UP Packing List P O Box 309 Me nom one e Fal ls WI 530 51 R...

Страница 3: ...Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas...

Страница 4: ...est ad quat et qu il n y a pas de fuites L alimentation principale en eau doit tre toujours OUVERTE On devra pr voir des dispositions pour emp cher tout arr t non autoris La norme ANSI Z358 1 requiert...

Страница 5: ...1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 4 1 1 1 S27 265 1 Trousse...

Страница 6: ...ltantes Aclarar el conducto del suministro de agua antes y despu s de la instalaci n Verificar que no haya fugas y que el flujo de agua sea adecuado El suministro principal de agua a la unidad debe es...

Страница 7: ...GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 4 1 1 1 S27 265 1 E...

Отзывы: