background image

3

Installation 

S19-310JJ

Bradley Corporation • 

215-163CP Rev. E; ECN 08-513 

9/11/08

Installation

Supplies Required:

•  (3) 3/8" floor anchors and bolts
•  Teflon tape and pipe sealant
•  Piping to 1-1/4" NPT water supply inlet and 1-1/4"  

NPT drain outlet on unit

•  Adequate supply pipe supports
•  Minimum 4" (102mm) drain to accommodate 30 

gallons (115 liters) per minute discharge for shower 
waste

•  OPTIONAL: sign-mounting hardware

NOTE: Local codes may require the installation 
of a backfl ow prevention valve to complete proper 
installation. Compliance with local codes is the 
responsibility of the installer. Valve must be tested 
annually to verify that it is functioning properly. Backfl ow 
prevention valves are not included with the fi xture and 
may be supplied by the contractor or purchased from 
Bradley Corporation.

Step 1: Secure base to floor

1.  Install three suitable anchors (supplied by installer) 

for 3/8" bolts in the floor.

2.  Bolt the base to the floor anchors using 3/8" bolts 

(supplied by installer).

Step 2: Assemble components

1.  Assemble the remaining unit components as 

shown on page 4.

•  Apply pipe sealant (by installer) to all male-

threaded pipe joints.

•  Use the rubber grip pad provided or a strap 

wrench around pipes when tightening to prevent 
marring. Place the grip pad on the pipe, then 
put the wrench over the grip pad and turn the 
pipe with the wrench.

•  Bottom edge of the showerhead should be 7'-0" 

(2134mm) from floor.

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.  Connect water supply piping to 1-1/4" NPT inlet 

on unit (piping by installer). Provide adequate 
supports (by installer) for supply pipe using pipe 
hangers or other means.

2.  Connect drain piping to 1-1/4" NPT drain outlet on 

unit (piping by installer).

3.  Hang the safety sign from the unit with the curtain 

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 1/8" (3mm) per threaded joint. To fi nd the tolerance 
of a dimension, add the number of thread joints in 
between a dimension and multiply it by 1/8" (3mm).

Ø

 9" (229mm) Flange 

with (3) 

Ø

 3/8" 

(10mm) Holes on 

Ø

 8" 

(203mm) Bolt Circle

Top View From Bowl

6"

(152mm)

9"

(229mm)

 

Ø 

10-3/4"

(273mm)

25-3/8" 

(645mm)

7'-0"

(2134mm) 

to Floor

24"

(610mm)

 

Ø 

10-3/4"

(273mm)

5-1/2" 

(140mm)

35-3/4" 

(908mm)

5-3/8" 

(137mm)

10-3/8" 

(264mm)

9-1/2" 

(241mm)

65-1/2"

(1664mm) 

to Floor

Содержание S19-310JJ

Страница 1: ...AX 262 251 5817 bradleycorp com Installation 215 163CP Rev E ECN 08 513 2008 Bradley Corporation Page 1 of 5 9 11 08 S19 310JJ Combination Drench Shower and Eyewash Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5 ...

Страница 2: ...oper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Product warran...

Страница 3: ...nstaller to all male threaded pipe joints Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring Place the grip pad on the pipe then put the wrench over the grip pad and turn the pipe with the wrench Bottom edge of the showerhead should be 7 0 2134mm from floor Step 3 Connect water supply IMPORTANT Do not rely on Bradley s Combination Unit to support sup...

Страница 4: ...gned Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement 1 2 3 4 3 2 3 4 6 3 8 9 10 12 13 15 14 14 1 14 2 16 17 18 19 20 21 22 1 22 2 22 3 22 11 24 26 25 23 27 1 27 2 27 3 27 4 27 5 27 7 5 7 11 11 1 11 31 11 2 11 4 11 3 11 5 27 71 27 27 6 18 22 22 4 NOTE ...

Страница 5: ...Plastic Showerhead Assembly 14 21 S24 187 1 Flow Control Assembly 23 GPM 15 128 156A 1 Pull Rod 24 Long 16 269 252 1 Reduc g Bushing 1 1 4 x 1 2 NPT 17 113 601 1 Pipe 1 2 NPT x 2 1 4 18 169 862 2 90 Street Elbow 1 2 NPT 19 269 255 1 Union 1 2 Female NPT 20 113 597 1 Pipe 1 2 NPT x 4 21 113 598 1 Pipe 1 1 4 NPT x 7 3 32 22 S30 070 1 1 2 Valve Handle Prepack 22 1 S27 282 1 1 2 Ball Valve with Jam Nu...

Отзывы: