3
Installation
S19-130BF, S19-130ABF
Bradley Corporation •
215-1263 Rev. C; ECN 07-522
8/27/07
Installation
Supplies Required:
• Teflon tape and pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to
accommodate 30 gallons per minute
discharge for drench shower waste
• Sign-mounting hardware
Step 1: Assemble drench shower
IMPORTANT: Some teflon sealants
may cause stress cracks in the plastic
showerhead leading to failure. Use teflon
tape for sealing the showerhead.
1. Assemble the components as shown
on page 4 (for units with plastic
showerhead) or page 5 (for units with
stainless steel showerhead).
• Apply pipe sealant or tape (by
installer) to all male-threaded pipe
joints.
• Use a strap wrench around pipes
when tightening to prevent marring.
• Bottom edge of showerhead should
be 7'-0" (2134 mm) from the floor.
2. To assemble the pull rod, thread jam nut on to threaded end, then thread pull rod into coupling
as shown. Tighten jam nut.
Step 2: Connect water supply
IMPORTANT: Do not rely on Bradley’s Drench Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide
adequate supports (supplied by installer) for supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using sign-mounting hardware supplied by installer.
3. Open water supply lines. Test for leaks and adequate water flow.
1" IPS Supply
S19-130BF
Ø 10"
(254mm)
S19-130ABF
Ø 10-3/4"
(273mm)
7-1/4"
(184mm)
9"
(229mm)
7'-0"
(2134mm)
Suggested
Height to
Floor
9"
(229mm)
45"
(1142mm)