3
Installation
S19-110BFSS
5/25/2012
Installation
Supplies Required:
• (3)
3
⁄
8
" floor anchors and bolts
• Pipesealant
• Pipingto1¼"NPTwatersupplyinletonunit
•Adequatesupplypipesupports
• Min.4"draintoaccommodate30gallonsperminute
dischargeforshowerwaste
• OPTIONAL:sign-mountinghardware
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by installer)
for
3
⁄
8
" bolts in the floor.
2. Boltthebasetotheflooranchorsusing
3
⁄
8
" bolts
(supplied by installer).
Step 2: Assemble components
1. Assembletheremainingunitcomponentsas
shownonpage4.
•Applypipesealant(byinstaller)toallmale-
threaded pipe joints.
•Usetherubbergrippadprovidedorastrap
wrencharoundpipeswhentighteningtoprevent
marring.Placethegrippadonthepipe,then
putthewrenchoverthegrippadandturnthe
pipewiththewrench.
•Bottomedgeofshowerheadshouldbe84"
(2134mm) from floor.
Step 3: Connect water supply
IMPORTANT: Do not rely on Bradley’s
Combination Unit to support supply piping.
1. Connectwatersupplypipingto1¼"NPTinlet
onunit(pipingbyinstaller).Provideadequate
supports(byinstaller)forsupplypipeusingpipe
hangersorothermeans.
2. Hangthesafetysignfromtheunitwiththecurtain
hooksprovided(ormountittothewallusingsign-
mountinghardwarebyinstaller).
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/- 1/8" (3mm) per threaded joint. To find the tolerance
of a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8" (3mm).
Ø
9" (229mm) Flange with
(3)
Ø
3
⁄
8
" (10mm) Holes on
Ø
8" (203mm) Bolt Circle
9"
(229mm)
34
3
⁄
8
"
(873mm)
84"
(2134mm)
to Floor
45"
(1142mm)
3¾"
(95mm)
41½"
(1054mm)
1
½"
(38mm)
netzerotools.com
netzerotools.com