Installation 

S19-110BFSS

5/25/2012

Installation

Supplies Required:

•฀ (3)฀

3

8

" floor anchors and bolts

•฀ Pipe฀sealant
•฀ Piping฀to฀1¼"฀NPT฀water฀supply฀inlet฀on฀unit
•฀฀Adequate฀supply฀pipe฀supports
•฀ Min.฀4"฀drain฀to฀accommodate฀30฀gallons฀per฀minute฀

discharge฀for฀shower฀waste

•฀ OPTIONAL:฀sign-mounting฀hardware

Step 1: Secure base to floor

1. Install three suitable anchors (supplied by installer)

for 

3

8

" bolts in the floor.

2.฀ Bolt฀the฀base฀to฀the฀floor฀anchors฀using฀

3

8

" bolts 

(supplied by installer).

Step 2: Assemble components

1.฀ Assemble฀the฀remaining฀unit฀components฀as฀

shown฀on฀page฀4.
•฀฀Apply฀pipe฀sealant฀(by฀installer)฀to฀all฀male-

threaded pipe joints.

•฀฀Use฀the฀rubber฀grip฀pad฀provided฀or฀a฀strap฀

wrench฀around฀pipes฀when฀tightening฀to฀prevent฀

marring.฀Place฀the฀grip฀pad฀on฀the฀pipe,฀then฀

put฀the฀wrench฀over฀the฀grip฀pad฀and฀turn฀the฀

pipe฀with฀the฀wrench.

•฀฀Bottom฀edge฀of฀showerhead฀should฀be฀84"฀

(2134mm) from floor. 

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.฀ Connect฀water฀supply฀piping฀to฀1¼"฀NPT฀inlet฀

on฀unit฀(piping฀by฀installer).฀Provide฀adequate฀

supports฀(by฀installer)฀for฀supply฀pipe฀using฀pipe฀

hangers฀or฀other฀means.

2.฀ Hang฀the฀safety฀sign฀from฀the฀unit฀with฀the฀curtain฀

hooks฀provided฀(or฀mount฀it฀to฀the฀wall฀using฀sign-

mounting฀hardware฀by฀installer).

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 1/8" (3mm) per threaded joint. To find the tolerance 
of a dimension, add the number of thread joints in 
between a dimension and multiply it by 1/8" (3mm).

Ø

 9" (229mm) Flange with 

(3) 

Ø

 

3

8

" (10mm) Holes on 

Ø

 8" (203mm) Bolt Circle

9"

(229mm)

34

3

8

(873mm)

84"

(2134mm) 

to Floor

45"

(1142mm)

3¾" 

(95mm)

41½" 

(1054mm)

1

½" 

(38mm)

netzerotools.com

netzerotools.com