S59-1005
Installation
2
8/7/2012
Bradley
• 215-1492 Rev. E; EN 12-03-009
Supplies Required:
• Teflon Tape
• Allen key wrenches
• Screwdriver
• 1/2" NPT Brass pipe plug
• Adjustable wrench
Rough-in
• Rough-in 1/2" NPT hot and cold water supply piping (supplied by installer) as shown below.
• For finished wall, make a 4-1/2" hole in the wall where the shower handle is desired.
• For unfinished wall, use the rough-in shield as a guide. Keep rough-in shield over valve when finishing
wall. The face of the rough-in shield should fit flush with the finished wall. The rough-in shield can either
be secured to the valve using the escutcheon screws or press-fit into place.
48"
24"
72"
7"
5"
FLOOR
3-1/4" MAX.
2-1/2" MIN.
3-7/8" MAX. DEPTH
3-1/8" MIN. DEPTH
6-1/2"
WITH STOPS
2-1/2" WITHOUT STOPS
HOT
COLD
1/2"
1-1/2"
NPT
1/2" NPT
PIPE PLUG
(SUPPLIED
BY OTHERS)
FLOOR
3-1/4" MAX.
2-1/2" MIN.
72"
3-7/8" MAX. DEPTH
3-1/8" MIN. DEPTH
7"
1/2"
NPT
40"
32"
12"
1-1/2"
Shower Only Installation
Tub/Shower Installation
HOT
COLD
SUPPLIES REVERSED
STANDARD INSTALL
Contact your Bradley Representative
and ask for S45-2264 Back-to-Back
Rotor Kit to swap out the rotor on the
reversed side.
"Back-to-Back" Installation
1