background image

Step 1.

Remove outer jacket door.

Step 2.

Disconnect wire leads from resettable thermal switch.

Step 3.

Using a multimeter capable of measuring continuity (Ohms),
place one probe of meter on one of the brass connection tabs of
the resettable thermal switch, and the remaining probe on the
other connection tab.

Step 4.

If continuity is indicated, the switch is closed, allowing millivolt current to pass.

Step 5.

If continuity is not indicated, the switch is open, possibly due to an over heating condition. The switch is
designed to open at predetermined temperatures depending on model. An open switch can be reset by
depressing the red colored button located at the center of the switch. The overheating condition must be
determined prior to putting the heater back in service.

RESETTABLE THERMAL SWITCH CONTINUITY TESTING

PROBABLE CAUSE FOR RESETTABLE THERMAL SWITCH ACTIVATION

PROBABLE CAUSE

CORRECTIVE ACTION

Insufficient combustion air

1. Verify adequate combustion air supply is

 available.

2. Clear jacket slot openings of any dirt, dust,

  restrictions or other obstructions.

3. inspect flame arrestor plate and clean with

  stiff brush and/or vacuum to remove scale
  deposits and debris.

1. Weak switch or switch

  out of calibration.

2. Incorrect switch.

1. Replace resettable thermal switch

2. Verify switch color code and approximate

 temperature.

Flammable vapor incident

1. Replace water heater.

SERVICE PROCEDURE 

RG-VIII

Resettable Thermal Switch

Testing and Replacement

The Bradford White

DEFENDER

Safety System

®

Color Code

Blue

Approximate switch

activation temperature

(open)

240°

Yellow

270°

Red

290°

Resettable thermal switch

color code reference.

34

34

34

Содержание W2504T

Страница 1: ...3S F BN CX SX MI404T F BN CX SX MI503 F BN CX SX MI50L F BN CX SX MI504S F BN CX SX MI60T F BN CX SX C S D W2504T F BN CX SX M430T F BN CX SX M440T F BN CX SX M4403S F BN CX SX M4503 F BN CX SX M460T...

Страница 2: ...Assembly Inspection Cleaning and Replacement 13 RG III Piezo Igniter Electrode Testing and Replacement 14 RG IV White Rodgers Robertshaw Gas Valve Testing and Replacement 15 RG V Honeywell Gas Contro...

Страница 3: ...ttom of the corrosion resistant combustion chamber The air then travels up through the oriented flame arrestor plate louvers where the velocity of the air is increased and its direction altered The ai...

Страница 4: ...embly 6 Replace Piezo igniter 1 Check connection at combination thermostat gas valve Proper tightness should be finger tight plus turn 2 Inspect thermocouple to ensure that it is fully engaged into pi...

Страница 5: ...ure 2 Unstable pilot 3 Pilot tube block or restricted 4 Resettable thermal switch has opened Service Procedure If the pilot will not stay lit replace pilot assembly If problem persists replace Gas Con...

Страница 6: ...ol is wet or physically damaged Pilot valve stuck in open position Service Procedure 1 See service procedure RG VI 1 Reset Gas Control 2 Replace Gas Control Replace Gas Control Flammable Vapor Ignitio...

Страница 7: ...If the information in these instructions is not followed exactly a fire or explosion may result causing property damage personal injury or death Step 5 After inspection of inner door as noted in step...

Страница 8: ...side inner door into position first Firmly position the radiused channel of the inner door aroundthe feedline Using the 2 hex drive screws from step 3d secure left side inner door in place DO NOT OVE...

Страница 9: ...of the inner door are properly positioned and sealed against the combustion chamber Step 12 Reconnect lead wires from combination thermostat gas valve to resettable thermal switch See photo in step 3...

Страница 10: ...lve Alligator clip to copper sheath of thermocouple Step 1 Disconnect thermocouple from combination thermostat gas valve Step 2 Connect a thermocouple adaptor BWC P N 239 44642 00 Robertshaw P N 75036...

Страница 11: ...RVICE PROCEDURE RG I Step 10 through Step 13 Step 8 To resume operation follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and o...

Страница 12: ...ground location jacket base screw etc OPEN CIRCUIT THERMOPILE TESTING Honeywell Gas Control Normal thermopile operation will be between 350mV 850mV If reading is less than 350mV replacement of pilot a...

Страница 13: ...age must be cleaned or replaced Honeywell pilot orifice not replaceable replace pilot assembly Step 10 Install pilot electrode assembly to feedline secure with screw from step 7 Step 11 Re Install bur...

Страница 14: ...line or gas valve and depress the Piezo igniter If there is a spark the igniter is OK the pilot is not functioning and must be replaced see SERVICE PROCEDURE RG III for pilot replacement If no spark i...

Страница 15: ...on If pressure is out of the specification noted in step 5 proceed to step 7 or 8 for proper service procedure Step 7 For White Rodgers control the manifold pressure is not adjustable If manifold pres...

Страница 16: ...of 6 millivolts the magnet is out of specification and the gas valve should be replaced MAGNET ASSEMBLY TESTING Robertshaw Control Step 1 Disconnect thermocouple from gas valve Step 2 Connect a therm...

Страница 17: ...ection Hex Drive Screws shown on Right Side Inner Door Hex Drive Screws at Flange section of Inner Door Remove Wire Tie For White Rodgers Control depress knob slightly and rotate clockwise to the OFF...

Страница 18: ...Reattach Piezo bracket with Piezo igniter to gas valve c Reattach main burner feedline pilot tube and thermocouple to gas valve NOTE Feedline nut for natural gas control uses right hand threads LP con...

Страница 19: ...combustion chamber are aligned with the right side inner door slotted openings Verify seal integrity around combustion opening Secure right side inner door using 2 hex drive screws from step 6b DO NOT...

Страница 20: ...as Control is designed so that any of these components may be replaced without replacing the entire Gas Control LINE PRESSURE The Gas Control is designed for a maximum line pressure of 14 0 w c and a...

Страница 21: ...and pressure tap and replace pressure tap plug Check for gas leaks prior to placing water heater back into operation by following the instructions located on the lighting instruction label or the lig...

Страница 22: ...e Ohms setting determine the resistance of temperature sensor see caution and photos above Replace Gas Control Once the temperature sensor resistance values are known the water temperature must also b...

Страница 23: ...In Degrees F Sensor Resistance at Various Temperatures Example If temperature of water is 84 F then the resistance through the sensor would be 8449 see shaded area NOTE Sensor resistance increases as...

Страница 24: ...s supply line from Gas Control Step 4 Disconnect piezo igniter wire Step 5 Remove inner door assembly following SERVICE PROCEDURE RG I steps 1 through 3c Step 6 Remove Gas Control cover screw Rotate k...

Страница 25: ...SASSEMBLY REASSEMBLY Step 8 Disconnect temperature sensor from control board and remove wire from the temperature sensor wire routing clip Disconnect temperature sensor Step 9 Remove the piezo igniter...

Страница 26: ...lling temperature sensor and insertion stick make sure the assembly is inserted FULLY into the backplate and the wires are routed through the wire routing clips Failure to do so will not allow valve b...

Страница 27: ...l in this direction Pull in this direction Step 13 To reassemble Gas Control follow the previous steps in reverse order Once Gas Control is reassembled burner assembly is reinstalled and the gas suppl...

Страница 28: ...et material on inner door Rotate knob counter clockwise to the OFF position Resettable Thermal Switch Wire Connection Hex Drive Screws Right and Left Side Inner Door Hex Drive Screws at Flange Area of...

Страница 29: ...fully inspect inner door gasket for the following Tears Gasket Adhesion to inner door Missing Material Other imperfections that will inhibit proper seal Cracks Material left on combustion chamber Dir...

Страница 30: ...left and right sides of the inner door are properly positioned and sealed against the combustion chamber Step 10 Reconnect 2 red wire leads from pilot assembly and Gas Control to resettable thermal s...

Страница 31: ...ips Steel burner models have a self adjusting air mixture and do not have an adjustable air shutter Cast iron burner can have the gas and air mixture properly proportioned by adjusting the air shutter...

Страница 32: ...RNER Inspection Adjustment Cleaning and Replacement cont Position thermocouple thermopile pilot tube and Piezo wire BURNER CLEANING Steel Cast Iron Step 1 Remove inner door assembly per SERVICE PROCED...

Страница 33: ...or to reinstallation of burner assembly If cleaning is required refer to SERVICE PROCEDURE RG VIII Step 10 Reinstall burner assembly into combustion chamber reconnect feedline thermocouple and pilot t...

Страница 34: ...ned prior to putting the heater back in service RESETTABLE THERMAL SWITCH CONTINUITY TESTING PROBABLE CAUSE FOR RESETTABLE THERMAL SWITCH ACTIVATION PROBABLE CAUSE CORRECTIVE ACTION Insufficient combu...

Страница 35: ...TEN SCREWS Step 6 Reconnect wire leads from combination thermostat gas valve to resettable thermal switch Note Wire termination are interchangeable with either resettable thermal switch connection Ste...

Страница 36: ...lear jacket openings of any dirt dust restrictions or other obstructions Step 6 Remove any debris from burner assembly per SERVICE PROCEDURE RG V and reinstall burner assembly into combustion chamber...

Страница 37: ...ottom of nipple should be free of any blockage Any damage such as cracks restriction due to deformation or unintentional holes are not field repairable and the inlet nipple dip tube must be replaced S...

Страница 38: ...is recommended If any of thesteel core of the anode is exposed replacement is recommended Step 6 Upon completion of inspection or subsequent replacement reinstall outlet nipple anode into heater Conne...

Страница 39: ...tch 15 Outer Door 16 Complete BN Burner Assembly Natural 17 BN Burner Only 18 Main Burner Orifice 19 Pilot Assembly 20 Pilot Orifice 21 Thermocouple Thermopile 22 Complete SX Burner Assembly LP 23 SX...

Страница 40: ...Email parts bradfordwhite com techserv bradfordwhite com www bradfordwhite com...

Отзывы: