35
PDV Series
35
Installation of Inner Door with Gasket
Step 11.
Clean any residual gasket residue or other debris
from combustion chamber surface before installing
the inner door/gasket assembly.
Step 12.
Place the left side inner door into position first.
Firmly position the radiused channel of the inner
door around the feedline. Using the ¼” hex drive
screws from step 6, secure left side inner door in
place.
DO NOT OVER TIGHTEN SCREWS
Step 13.
Position pilot tube and igniter/sensor wire against
left side inner door flange gasket.
DO NOT
ROUTE THROUGH RADIUSED CHANNEL WITH
FEEDLINE.
WARNING
Stripped fastener connections
may allow for seal breach of
inner door. A seal breach may
result in a fire or explosion
causing property damage,
personal injury or death. Do
not over tighten screws in
steps 12, 14 and 15.