Page 76
turn “OFF” the pilot test hold.
8.
Unit is equipped with a zero governing,
negative regulator valve. The valve throttle
VKRXOGEHDGMXVWHGRQO\DWKLJK¿UHDQGWKH
offset adjustment is only to be done at low
¿UH)RPH´VFUHHQWRXFKWKHFRQWURO
icon, then touch, Diagnostics. On the I/O
status screen press “Diagnostic Tests” and
enter the installer password by pressing the
padlock in the upper right corner.
Menu 30. Burner Status
Menu 31. I/0 Status
9.
From here you can manually adjust the
fan speed by pressing either the “Maximum
Modulation” or “Minimum Modulation”
buttons, then the “Start Test” button. In this
PRGHWKHERLOHUZLOOUXQDWWKHVHOHFWHG¿ULQJ
UDWHIRUDSHULRGRI¿YHPLQXWHVRUXQWLOWKH
“Stop Test” button is pressed. The fan speed
control feature is only active when the boiler
LVLQ³5XQ´PRGH7RVHWXSKLJK¿UHVHOHFW
“maximum modulation”, then “Start Test”
buttons. Wait for the boiler to enter run and
the fan speed to reach the maximum RPM.
Using a combustion analyzer, dial in the high
¿UHWKURWWOHWRREWDLQWKHFRUUHFW&2DQG&2
measurements. (refer to Table 23 for correct
CO2 ranges).
Menu 32. Modulation Test
2QFHKLJK¿UHLVVHWXSFRUUHFWO\VHOHFW
“Minimum Modulation” and wait for the fan
speed to reach minimum RPM. When at
ORZ¿UHDGMXVWWKHRIIVHWVFUHZWRDGMXVW
WKHORZ¿UH&2WRWKHFRUUHFWYDOXHV
(refer to Table 23 for correct CO2 ranges)
$IWHUWKHVLJKDQG/RZ¿UHKDYH
been completed, head back to the “Firing
Rate” menu, and select “Automatic”. This
MUST be done to ensure proper boiler
operation.
Model
Propane
2UL¿FHLQFKHV
Propane
Pressure
Natural
Pressure
1600
0.035
3” - 4”
3” - 4”
2000
0.040
3” - 4”
3” - 4”
2500
0.035
3” - 4”
3” - 4”
3000
0.035
3” - 4”
3” - 4”
3500
0.047
2” - 3”
3” - 4”
4000
0.047
2” - 3”
3” - 4”
Table 22. Required Pilot Gas Pressures
Содержание Brute MagnaTech BMGH1600
Страница 4: ......
Страница 47: ...Page 43 Figure 24 High voltage wiring diagram Model 1600 208V Single Phase ...
Страница 54: ...Page 50 8 12 Ladder Diagrams continued Figure 31 Model 1600 208V 1 Phase ladder diagram ...
Страница 56: ...Page 52 8 12 Ladder Diagrams continued Figure 33 Model 2000 208V 1 Phase ladder diagram ...
Страница 104: ...Page 100 1 13 12 4 3 5 13 2 15 DETAIL A 9 10 8 DETAIL Final Assembly ...