Bradford White Brute BNTH Скачать руководство пользователя страница 7

Page 5

Brute

  

BOILERS AND VOLUME WATER HEATERS

SHUTTING DOWN THE BRUTE

It may sometimes be necessary to shut down the Brute. Here are the steps required to do 

this:

1.  Switch off the main electrical disconnect switch.
2.  Open the front cover and close the main manual gas valve.
3.  If freezing is anticipated, drain the Brute.  (Also be sure to protect the piping in the 

building from freezing.)

The steps listed above may require qualified service personnel.

RESTARTING THE BRUTE

It may be necessary to restart the Brute – for example, after a power interruption.  Here are 

the steps required to do this:
1  Reset any errors using the Touchscreen Display.  See the section on “About Lockouts, 

Holds, and Alerts.”

2  Turn up the thermostat to call for heat.
3.  In approximately 2 seconds, the blower will operate.  Ignition should occur after 35-40 

seconds. It may take as long as 2-1/2 minutes.

4.  If ignition does not occur, wait 5 minutes and then repeat steps 1 through 3.
5.  If, after three attempts, the unit still does not light, shut down the boiler and call your 

service technician.

If the unit has been drained, follow these steps:

1.  See the “Installation and Operation Manual” for instructions on filling and purging the 

unit.

2.  Remove the front door. Turn on the gas shutoff valve.
3.  Switch on the main electrical disconnect switch. The pump and blower will start, and 

the igniter will be energized.  After 35 seconds the gas valve will be energized, and 

ignition will occur. If ignition does not occur within 2-1/2 minutes switch “off” the 

main disconnect switch, wait 5 minutes and switch it “on” again. If after three attempts 

ignition does not occur, shut down the unit and call for service.

IN THE EVENT OF POWER FAILURE

The Brute will not operate during an electrical power outage. If there is an extended power 

outage with danger of freezing, then the Brute (and all other water systems) should be 

completely drained.   Before draining the unit, turn off the gas and turn off the main power 

switch. When you replace the unit in service, refer to the “Installation and Operation 

Manual” for instructions on filling and purging.

Содержание Brute BNTH

Страница 1: ...hich could cause serious injury property damage or death Improper installation and or operation will void the warranty AVERTISSEMENT Assurez vous de bien suivres les instructions donn es dans cette no...

Страница 2: ...Off the Gas to the Unit 3 Instructions de Mise en Marche 4 Fermeture de l Alimentation en Gaz 4 Shutting Down the Brute 5 Restarting the Brute 5 In the Event of Power Failure 5 USING THE TOUCHSCREEN...

Страница 3: ...ET WATER OUTLET AIR INLET FILTER BOX DRAIN VALVE CONDENSATE TRAP GAS VALVE ON OFF SWITCH The Bradford White Brute is offered in both Indoor and Outdoor models for all sizes as both Boiler and Volume W...

Страница 4: ...pplier call the fire department POUR VOTRE S CURIT LISEZ AVANT DE METTRE EN MARCHE AVERTISSEMENT Quiconque ne respecte pas la lettre les instructions dans la pr sente notice risque un d but d incendie...

Страница 5: ...ety information listed above If you don t smell gas go to the next step 8 Slowly turn the manual gas valve to ON The handle on the valve will be parallel to the gas pipe 9 Replace the front panel 10 T...

Страница 6: ...ochaine tape 8 Remettez lentement la soupape d arr t de gaz en position ON La poign e sera parall le au tuyau de gaz 9 Replacez le couvercle avant 10 R tablissez l alimentation lectrique l appareil 11...

Страница 7: ...h 3 5 If after three attempts the unit still does not light shut down the boiler and call your service technician If the unit has been drained follow these steps 1 See the Installation and Operation M...

Страница 8: ...to the display Simply touch the screen to wake it up While under normal operation the Touch Screen will automatically present this Home Screen See Menu 1 Menu 1 Home Screen Menu 2 Status Summary The h...

Страница 9: ...hooting functions The installer level password is lnt lower case LNT See Menu 3 User no password required Non critical adjustments and functions including adjusting the Central Heat and Domestic Hot W...

Страница 10: ...make a change For more information on logging in see Section 8 2 2 If you make a change in any group that could affect the safe operation of the unit the control system will ask you to verify the chan...

Страница 11: ...the verification will be cancelled A count down timer is shown at the bottom of the screen 8 5 Checking Individual Parameters 1 From the Home screen Menu 9 press the icon for the controller Menu 9 Ho...

Страница 12: ...he clock 1 Start at the Home screen Menu 11 Home screen 2 Press the Setup button on the lower right corner of the screen The system will present the Setup screen Menu 12 Setup Screen 3 Press the Displ...

Страница 13: ...ation Menu there are 18 Configuration Sub Menus Use the scroll tab on the right to view them all The next section of this manual will show the installer these sub menus and the basics on how to setup...

Страница 14: ...arrow to see further options When using the Brute for hydronic heating a call for heat must be supplied to the T T terminals found on TB7 labeled T T or Interlock Once a call for heat is established t...

Страница 15: ...utdoor Temperature and Low Water Temperature to get to each and adjusting their setpoints in those sub menus 8 7 4 DHW Domestic Hot Water Configuration DHW Domestic Hot Water is used to configure the...

Страница 16: ...7 6 Demand Priority Configuration From the Demand Priority Configuration the installer can adjust the priority of the different demand types Central Heat Lead Lag Domestic Hot Water The control uses...

Отзывы: