MODUL-AiR ERECTING INSTRUCTIONS
(V-1.10)
WE URGE YOU TO TAKE THE TIME TO STUDY THESE INSTRUCTIONS IN EVERY DETAIL!
** YOU MUST KEEP YOUR BOX WHILST YOUR AWNING IS UNDER WARRANTY **
This is a very large box which we have made especially for our AiR awnings.
You will struggle to find a similar box if you choose NOT to keep the original.
We will be unable to collect your awning whilst under warranty, if you do not keep this box.
Firstly, check the contents of each box within 7 days of receipt. If for any reason some items are
found to be missing then it’s important we know which box they are missing from in order to send
you the correct quantity. A check list can be found at the end of this document. This is a good time
to familiarise yourself with the various component parts of your awning.
INSTRUCTIONS
We recommend that the draught cloth and wheel arch cover are fitted first. This helps to avoid
catching parts of the awning within the wheel arch or under the caravan.
(NB. Grease, oil, tyre
dressing etc, cannot be removed from the canvas and is not covered by the warranty)
IMPORTANT
Ensure that all air valves are
fully closed
(diagram 1). This can be achieved by pressing
in the valve insert within the valves core with your finger or thumb and turning it clockwise.
(Do not
use pliers or similar to do this, it will damage the valve and this would not be covered by our
warranty.)
The valves are fitted to the bottom of each main AiR beam.
(To test, push the insert
down with your finger and it should spring back up following your finger out of the valve.)
See
below;
When inflating your new AiR awning, we recommend that for the first two or three times, you leave the dust
caps OFF the valves whilst inflating. Once you are happy that the awning is fully inflated, you can then replace
the dust caps. We recommend inflating using the centre valve on the 260 and 330 models or either of the
centre valves on the 390 model.
If whilst inflating the awning, any of the valves appear to be not fully closed, push in and out a couple of times
with your finger to rectify this.
VALVE CLOSED (Ready for
inflation
)
VALVE OPEN (Ready for
deflation
)
Diagram 1
Diagram 2