STEP 9
Parts:
• Upper Lat Tower Assembly
(from Step 8)
• Base Assembly
(from Step 7)
Tool:
• Hex Key (7/32”)
9-1
insert the Upper Lat Tower Assembly into the Lower Lat
Tower.
9-2
install and completely tighten the hardware.
STEP 10
Parts:
• Face Plate
• 2 Face Plate Back Panels
• Base Assembly
(from Step 9 )
Tool:
• Phillips Head Screwdriver
10-1
Place the Face Plate against the
Lower Lat Tower.
10-2
Position both Face Plate Back Panels
against the Lower Lat Tower and around
the Rod Box.
10-3
install and completely tighten the hardware.
Upper Lat
Tower
Assembly
Base
Assembly
Washer
Button
Head
Screw
6 Washers (3/8”)
6 Button Head Screws (3/8” X .75”)
4 Self Threading Screws (#10 X .75”)
Hardware
(1:1)
:
Hardware
(1:1)
:
Lower Lat
Tower
Base
Assembly
Face Plate
Face Plate
Back Panel
Self
Threading
Screw
Rod Box
Assembling Your Bowflex
®
Motivator
®
2 Home Gym
A8
Assembling Your Bowflex
®
Motivator
®
2 Home Gym
Содержание Motivator 2
Страница 1: ...51516 Rev B 07 2005 WWW BOWFLEX COM The Bowflex Motivator 2 Home Gym Assembly Instructions...
Страница 2: ......
Страница 15: ......