Installation Guide
Cut material to length required using Novaneon Shears (cut only
at intervals marked on the side of the casing).
Install clear PC terminals to both ends of Novaneon to prevent
glue leaking to LED units. Trim edge of cut section with a neat 45
degree bevel to allow connectors to engage more easily.
1
2
Install End Cap
Apply 2mm of silicone glue to bottom surface of endcap before
sliding into position.
Install Power Connection Sleeve.
Slide power connection sleeve into position as indicated, take care
not to slide too far.
3
4
Install Power Connection Plug
Apply 2mm of silicone glue to bottom surface of power
connections plug before sliding into position. Separate silicone
case from PCB using provided scraper as required.
Novaneon strip can be mounted using Aluminium Track or clear
clips. When handling strip, take care to only bend horizontally and
do not twist/stretch strip as this may damage internal components.
5
6
WARNING
Please read these instructions completely and carefully.
Risk of electrical shock. Disconnect power before servicing or installing product
SALES & SUPPORT
PH
02 9517 3222 |
E
www.bounceled.com.au
Содержание NOVANEON Reflex
Страница 1: ...Reflex NOVANEON RANGE ...