
3-7
190 Outrage
Section 3 • Systems & Components Overview & Operation
R
Livewell (optional)
If equipped, a 15 Gal. (57L) livewell that is integrated
into the leaning post. The livewell’s primary function
is to keep baitfi sh alive by circulating fresh seawater
into the tank. A raw water pump and plumbing service
the system. Access to the raw water pump is through
the deck hatch located on the cockpit fl oor behind
the livewell base.
NOTICE
The seacock MUST be in the OPEN position.
Running the pump dry may cause damage to
the unit.
Operation
The livewell can be filled by pressing the
“LIVEWELL” switch on the instrument panel. There
is a tube in the livewell that will prevent the system
from overfl owing. Excess water will be drained out
through a transom drain fi tting overboard.
Maintenance
Maintenance of the livewell system will require you
to check the pump opening and strainer for debris
and impediments, this can be done visually on dry
land. The pump opening is located on the aft part of
the hull on the starboard side.
Livewell
Fig. 3.7.1
1
2
3
4
5
6
7
15 GAL (57 L) LIVEWELL
THRU HULL DRAIN AT TRANSOM
INTAKE STRAINER
SEACOCK
500 GPH (1893 LPH) PUMP
BASE DRAIN
FILL INLET
ACCESS PLATE TO FLOW CONTROL VALVE
FLOW CONTROL VALVE
OVERFLOW DRAIN
DRAIN STRAINER
LIGHT
DRAIN PLUGS
8
CLOSE
9
10
11 12
13
1
2
3
4
5
6
8
7
9
10
11
12
13
Содержание 190 Outrage
Страница 2: ......
Страница 12: ...xii 190 Outrage R THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...2 22 190 Outrage Section 2 General Information R THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 69: ...4 5 190 Outrage Section 4 Electrical System R Switch Instrument Panel Schematic Fig 4 5 1 ...
Страница 70: ...4 6 190 Outrage Section 4 Electrical System R Hull Wiring Diagram Fig 4 6 1 ...