Boss SOLO700 Скачать руководство пользователя страница 2

During use

Wind description

Beaufort scale

Beaufort no. Speed in mph

Speed in m/sec

Medium breeze

Raises dust and loose paper, twigs snap off

4

8 - 12

4 - 6

Strong breeze

Large branches in motion, telegraph wires whistle

6

25 - 31

11 - 14

Gale force

Walking is difficult

8

39 - 46

17 - 21

• 

  Beware of open-ended buildings, which can cause a funneling effect.

• 

  Raising and lowering components, tools, and/or materials by rope should be conducted within the tower base. Ensure that the safe working 

load of the supporting decks and the tower structure is not exceeded.

• 

  The assembled tower is a working platform and should not be used as a means of access or egress to other structures.

• 

  Beware of horizontal forces (e.g. power tools) which could generate instability. 

Maximum horizontal force 30kg.

• 

  The stairway towers, featuring an inclined staircase access, are for frequent use by personnel carrying tools and/or materials.

• 

  Do not use boxes or stepladders or other objects on the platform to gain extra height.

Beware of high winds in exposed, gusty or medium breeze conditions. We recommend that in wind speeds over 7.7 metres per second 

(17mph), cease working on the tower and do not attempt to move it. If the wind becomes a strong breeze, (expected to reach 11.3 metres per 

second - 25 mph) tie the tower to a rigid structure. If the wind is likely to reach gale force, (over 18 metres per second - 40 mph) the tower 

should be dismantled.

ASSEMBLY PROCEDURE

From the ground level, position a 

trapdoor deck on rung 8. Engage 

the wind-locks. Locate assembly bracket 

No. 1 on front face of lowest camlock 

guardrail. Locate the second 

assembly bracket on rung 10 of the 

end frames.

6

Hang four camlock guardrail units in order on the front 

assembly bracket and then 1 x folding toe board. Place the 

last camlock guardrail on the end frame assembly bracket No 2. 

Hang two pairs of connected 4 rung frames on the end bracket No 2. 

then hang the second trapdoor deck on the bracket.

Climb the tower from the inside and from a protected 

position on the trapdoor. Reach to the side bracket and take 

one camlock guardrail. Position the guardrail on the rear of the tower 

as shown. All guardrails should fix to the 2nd and 4th rung above 

the platform deck. Repeat with second camlock guardrail frame on 

the front of tower to fully secure platform. Engage and lock camlock 

claws. 

Do not climb onto the platform until guardrails are in place.

8

For a detailed user guide, please go to 

bossaccesstowers.com/literature

Standing up on the protected platform, lift the second 

trapdoor deck onto the platform. Store by the rear guardrail 

clear of the end frames.

9

Add the connected pairs 

of end frames taking care 

to engage the locking clips. Add a 

camlock guardrail to rungs 13 & 15 

and lock.

10

Remove the end frame 

assembly bracket from 

rung 10 of the end frame and 

re-position on the top camlock. 

Position the folding toe board 

set and then the remaining 

two camlock frames on the 

uppermost bracket.

11

Place the trapdoor deck onto the 16th rung of the tower and 

engage wind-locks. 

Climb the end frame from within and from the protected trapdoor 

position, fit the camlock guardrails as shown.

12

• 

  To comply with the ‘Work at Height Regulations’, we show 

assembly procedures with platforms every 2 metres in height 

and the locating of guardrails (in advance of climbing onto a 

platform) to increase safety and reduce the risk of a fall.

• 

  Never stand on an unguarded platform positioned above the first 

rung of a tower. If your risk assessment shows it necessary, you 

may also need to add guardrail platforms at this level.

    The procedure illustrated shows a 6.2m working height tower.

Insert castor into adjustable leg. Apply brake by pushing The 

lever down, release frame interlock clips and fit the leg and 

castor assembly into a 1m base frame. Repeat with the remaining 

legs and castors. Adjustable legs should only be used for levelling.

1

FOLDING BASE METHOD:

Release brakes on castors at one end frame until the locks 

engage on the rear folding frame.

Ensure both hinges positively lock into position. Engage brakes on 

second frame.

2

Locate the horizontal brace on the lowest rung with the 

hooks facing downwards - check the brace is correctly 

locked on the tube at both ends. Check the base unit is square and 

level using a spirit level. Adjust legs only to level and not to gain 

additional height.

3

STEP 1: Connect two 4 rung frames together. Check the 

interlock clips are engaged and add onto the base unit. 

Repeat for the other side.

STEP 2: Position one camlock guardrail unit. The top hooks should 

locate on the 7

th

 rung from base level.

STEP 3: Engage camlocks as shown to lock guardrail unit in 

position.

4

Fit stabilisers to tower before extending 

telescopic leg. Position top clamp above rung 6, 

second clamp locates above rung 2. Extend telescopic leg 

by removing the interlock clip. Slide the leg out until the leg 

reaches the ground. Rotate the leg until the interlock clip 

holes line up. Lock the leg by using the interlock clip and 

adjust the stabiliser to ensure the stabilisers are engaged.

5

X

X

90%

2 x Guardrail Frames

1 x Folding Toe Board

2 x Guardrail Frames

2 x Guardrail Frames

2 x 21m End Frames

1 x 1.3m Deck

Warning: Assembly Brackets are designed and intended only to aid 

assembly and dismantling.

Unclip the storage strap from the folding toe board set, 

unfold and fit the toe board into position on the working 

platform. Move assembly brackets to base of the tower and fit to the 

lowest rungs of the end frames.

13

DISMANTLING PROCEDURE

Simply follow the assembly steps in reverse, ensuring that the 3T 

method is followed.

STORAGE TROLLEY 

ASSEMBLY

Assemble the folding base frame with one trapdoor deck 

placed on the bottom rung forming the base of the trolley. 

Lower all adjustable legs as far as possible.

1

Fit the folding toe board set to the trapdoor deck.Position 

the 1.3m horizontal brace on the front upright, just above 

the 4

th

 rung.

Place the assembly brackets, one at each end on the inside of the 

folding base unit end frames.

2

Place the camlock frames, 

three at either end within the 

trolley. Ensure the diagonal struts of 

the camlock frames fit between the 

arms of the assembly brackets.

3

Place the 1m end frames 

in the centre of the trolley 

between the guardrail frames.

4

Add the final trapdoor deck 

 

in front of the 1m end frames. 

Fit the four SP4 stabilisers in front of 

the trapdoor deck. 

The trolley unit is now complete.

5

The BoSS SOLO

700

 system has been developed so that a single 

person can safely build the tower to a platform height of 4.2m.

7

PN3304100 BoSS_DL_Folded_Solo_700_Quick_Guide rev1217.indd   2

07/12/2017   16:59

Отзывы: