
Page 11
STEP 2:
Installing the two wheels. See FIGURE 4.
1. It is helpful to set the reservoir tank assembly on some blocks before mounting the wheels. Remove the plastic
shipping caps from the wheels and slide the wheels onto the axels.
2. Screw the castle nuts onto the axels and tighten with an adjustable wrench to seat the bearings. Then back the
castle nuts off one full turn and snug them up to the bearings by hand until the hole in the axel lines up.
3. Insert the split pin into the slot of the castle nut and the hole in the axel then bend the ends of the pin with needle
nose pliers keeping it close to the castle nut so the dust cap fits over it.
4. Tap the dust caps onto the wheel using a soft faced hammer.
REF. NO.
DECSRIPTION
QTY.
4
Off- Road tire / Wheel
2
5
Hardware Kit #2, including:
1
5-1
Castle nut / 1-14
2
5-2
Split pin /
Ø
4 x 50
2
5-3
Dust cap
2
STEP 3:
Installing the beam assembly. See FIGURE 5
1. Set the beam assembly on blocks high enough so the tank assembly can be rolled underneath it. Two or more
people are recommended to assist with raising the beam as it is very heavy, lifting tools such as a hoist, crane or
jack are strongly recommended. Be sure to keep hands away from any possible pinch points.
2. Screw off the 4 sets of M12 hardware on both sides of the rear end of the beam.
3. Position the tank assembly so that the beam support brackets are on the inside of the main beam.
4. Slide the Bolts M12 x 40 just removed through the aligned holes and tighten the hardware using a 18mm wrench
for bolts and a 19mm wrench for the lock nuts. You may need another helper to lift up the tongue for the holes to
align.
Page 14
(FIGURE 4)
Содержание GD13T21
Страница 31: ...Page 25 EXPLODED DIAGRAM PARTS LIST Page 28...