background image

AWNING MOUNT KIT INSTALLATION GUIDE

Boss Aluminium Pty Ltd

Ph. (03) 9909 5353
[email protected]
8/208 Canterbury Road, Bayswater North VIC, Australia

Содержание RT1

Страница 1: ...AWNING MOUNT KIT INSTALLATION GUIDE Boss Aluminium Pty Ltd Ph 03 9909 5353 sales bossaluminium com au 8 208 Canterbury Road Bayswater North VIC Australia ...

Страница 2: ...P 2 Mount the supplied brackets to your awning A B STEP 3 Hold the awning in place on the tent and mark the location of the front and rear mounts Remove the tent section of the brackets and line it up with your markings use this as a template to mark where you will drill your holes The strongest point of the RT1 is in the corners if you have a 270 awning place the rear mount as far back as possibl...

Страница 3: ...ker Clean area and put silicone around each hole for the external and internal mounting plates This will prevent any water or dust from entering A B STEP 6 Ensure that you have all necessary washers and split washers Apply thread locker to your supplied bolts Get your helper to hold the external plate onto the tent and feed the bolts through Place the internal mounting plates over the bolts and ti...

Страница 4: ...e it dries STEP 8 Slide the awning brackets over the tent mounted brackets and set it to your desired height Apply thread locker to the supplied bolts and tighten evenly If you require any further assistance please feel free to contact us 03 9729 3092 sales bossaluminium com au ...

Страница 5: ...Boss Aluminium Pty Ltd Ph 03 9909 5353 sales bossaluminium com au 8 208 Canterbury Road Bayswater North VIC Australia ...

Отзывы: