4
|
Operation
Gaz 6000 W
8 716 473 217 (2014/07)
3.4
Top up the heating system
The filling unit is located at the bottom of the appliance between the
connection for the heating flow and the cold water connection.
Maximum pressure
of 3 bar at maximum heating water temperature
must not be exceeded (safety valve will open).
Fig. 5
▶ Open the fill valve and fill the heating system until a pressure between
1 and 2 bar is indicated on the pressure gauge.
▶ Close the fill valve.
4
Operation
4.1
Overview of controls
Fig. 6
[1]
Standby key
[2]
Burner operation
[3]
Fault display/standby mode display
[4]
Heating mode active
[5]
DHW heating active (N.A)
[6]
Summer mode active
[7]
Service Mode
[8]
Temperature display (in °C)
[9]
– key (mode)
[10] “Back” key (= exit service function/submenu without saving)
[11] + key
[12] OK button (= confirm selection, save value)
NOTICE:
Damage to appliance due to cold water!
Stress cracks can occur on the hot heat exchanger when
the heating water is topped up.
▶ Only top up the heating water when the appliance is
cold.
8 716 473 217-04.1O
ok
reset
press
5s
6
720
806
464-05.1O
1
12
11
10
9
4
3
2
5
6
7
8
m
o
d
e
Содержание WBN 6000-30-H-E-N/L-S2400
Страница 8: ......