Inspection and maintenance

9

Uni Condens 8000 F – 6720867069 (2016/10)

6.3.1

When should you check the operating pressure in the 
heating system?

The fill and top-up water quality must comply with the specifications in 
the operator's log supplied.

Air pockets may form in the heating system through the fill or top-up 
water releasing gases.

▶ Vent the heating system (e.g. at the radiators).
▶ If required, top up with water.

Recently added fill or top-up water loses much of its volume in the first 
few days because it releases gases. 

With newly filled systems: 
▶ Initially check the operating pressure of the heating water daily and 

then in ever increasing intervals.

Once the heating system is hardly losing any volume: 
▶ Check the operating pressure of the heating water once a month

A distinction is made between open and closed systems. In practice, 
open vented systems are rarely installed nowadays. We will therefore be 
using a closed heating system to demonstrate how you can check the 
operating pressure. All settings will have already been made by the 
contractor when the system was first commissioned.

6.3.2

Sealed unvented systems

NOTICE: 

System damage due to frequent topping up!

Subject to the water quality, your heating system can be damaged 
through corrosion or scaling.

▶ Ensure that the heating system is vented correctly.
▶ Check the heating system for leaks and the expansion vessel for 

functionality.

▶ Observe the requirements regarding water quality 

(

 operator's log).

▶ If water loss occurs frequently, locate the cause and rectify the 

problem without delay.

NOTICE: 

System damage due to temperature stresses!

▶ Only fill the heating system when cold (the flow temperature must not 

exceed 40 °C).

▶ During operation, only fill the heating system via the filling facility in 

the heating system pipework (return).

In closed systems, the pressure gauge needle (

 fig. 2, [3], page 9) 

must be within the green marking [2]. The red needle [1] of the pressure 
gauge must be set to the minimum pressure required for the heating 
system.

▶ Check the operating pressure of the heating system.

If the pressure gauge needle [3] drops below the green marking [2]:
▶ Top up with water.
▶ Top up with water via a filling facility in the heating system pipework.
▶ Remove air at the heating system.
▶ Check the operating pressure again.

Fig. 2  

Pressure gauge for sealed unvented heating systems

[1]

Red needle

[2]

Green marking

[3]

Pressure gauge needle

6.3.3

Installations with automatic pressurisation units

For installations in which an automatic pressure maintaining system is 
integrated:
▶ Follow the manufacturers' instructions.
▶ Observe water quality requirements (

 operator's log).

6.3.4

Water samples

The quality of the fill, top-up and boiler water must be regularly 
documented in an operator's log.

▶ Have water samples taken by a contractor.
▶ Document result in operator's log.

6 720 648 053-30.1T

1

3

2

Содержание Uni Condens 8000 F UC8000F

Страница 1: ...6720867069 2016 10 GB IE Operating instructions for users Floor standing condensing boiler Uni Condens 8000 F UC8000F 800 1200 kW ...

Страница 2: ...heating controller etc prior to operation Observe the safety instructions and warnings 1 Explanation of symbols and safety instructions 2 1 1 Explanation of symbols 2 1 2 General safety instructions 2 2 Product Information 4 2 1 Declaration of Conformity 4 2 2 Determined use 4 2 3 Symbol at the boiler 4 2 4 Data plate 4 2 5 Product Description 4 2 6 Permissible fuels 5 2 7 Operation conditions 6 2...

Страница 3: ...lified person so that risks are avoided H Risk through oil leaks If using oil as fuel country specific regulations hold the operator responsible for asking a contractor to correct any oil leaks the moment they are discovered H If you smell gas Close gas isolation valve Open windows and doors Do not touch any electrical switch telephone and do not use outlets Extinguish any naked flames Do not smok...

Страница 4: ...ity for this product For this see the contact address on the back cover of these instructions 2 2 Determined use The Uni Condens 8000 F 800 1200 floor standing condensing boiler has been designed for wet heating systems in e g apartment buildings or industrial applications The boiler is only approved for open flue mode When installing and operating the heating system Comply with standards regulati...

Страница 5: ...ure return 14 Inspection opening on the water side both sides 15 Flow safety line 16 Heating flow 17 Boiler safety assembly accessories 18 Lifting points 2 6 Permissible fuels The boiler must only be operated with the specified fuels Only burners that are suitable for the specified fuels may be used Gas burner The combustion of biogas is not permitted Permissible fuels Natural gas from the public ...

Страница 6: ...ere should be a maximum of 6 burner starts per hour averaged over burnerruntimeononeday Ifthenumberofstartsishigher theuser should be notified The system must be checked to find out whether thenumberofburnerstartscanbereduced Thecustomerserviceof the manufacturer can provide assistance with optimisation of the system 2 9 Burner requirements Only use specified pressure jet gas burners with floor st...

Страница 7: ...d guidelines Observe the information on the data plate of the boiler 3 1 Combustion air quality To avoid corrosion keep the supply of combustion air free of corrosive substances e g halogenated hydrocarbons that contain chlorine or fluorine compounds Never use or store chlorinated cleaning agents or halogenated hydrocarbons as contained in spray cans solvents or cleaning agents paints and adhesive...

Страница 8: ... e g due to a fault shutdown and there is a risk of frost drain the heating water at the DFV Also leave the air vent at the highest point in the heating system open 5 1 Shutting down the heating system The heating system is shut down via the control unit The burner is also automatically shut down Switch off the burner at the control unit 5 2 Shutting down the heating system in an emergency Only sw...

Страница 9: ...nted correctly Check the heating system for leaks and the expansion vessel for functionality Observe the requirements regarding water quality operator s log If water loss occurs frequently locate the cause and rectify the problem without delay NOTICE System damage due to temperature stresses Onlyfilltheheatingsystemwhencold theflowtemperaturemustnot exceed 40 C During operation only fill the heati...

Страница 10: ...Further information on the fault displays can be found in the service instructions of the relevant controlunit Inaddition burnerfaultsaresignalledbyanindicatoronthe burner Press burner reset button see operating instructions of burner and control If the burner still fails to start after three attempts contact a contractor 8 2 Other faults For other possible faults see the installation and operatin...

Страница 11: ......

Страница 12: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...

Отзывы: