11
en | Installing the UML-190-90
UML-190-90
F01U075712 | 1.0 | 2007.09
Installation Manual
Bosch Security Systems, Inc.
5
Installing the UML-190-90
This chapter outlines the procedures needed to install the UML-190-90 Series. A qualified ser-
vice person should install the monitor and adhere to all local codes.
5.1
Mounting the UML-190-90
The UML-190-90 is designed to be used on a desktop or mounted to a wall or rack.
5.1.1
Desktop Installation
The UML-190-90 monitor is delivered with a 3-pole US-style power cord and a 3-pole Euro-
style power cord. Use the US-style power cord where 120 VAC, 60 Hz power is available; and
use the Euro-style power cord where 230 VAC, 50 Hz power is available. The monitor automat-
ically adjusts to either power input voltage.
5.1.2
Wall Mount Installation
The square mounting holes (100 mm (3.9 in.) centers) can be used with wall mount brackets
UMM-LW-20B fixed or UMM-LW-30B swivel/tilt. To install the wall mount, do the following:
1.
Remove the UML-190-90 base from the LCD panel section by unscrewing the four (4)
holding screws before separating the base from the panel.
Fig. 5.1
Removing the Base
2.
Mount the unit to the mounting device (not provided) using the four (4) mounting holes
on the rear panel. The square mounting hole patterns are standard on 100 mm (3.9 in.)
centers.
i
NOTICE!
Save screws for future use.
Содержание UML-190-90
Страница 1: ...Bosch 19 inch High resolution LCD Monitor UML 190 90 en Installation Manual ...
Страница 2: ......
Страница 4: ...iv en UML 190 90 F01U075712 1 0 2007 09 Installation Manual Bosch Security Systems Inc ...
Страница 31: ......