Installing the roof connection
11
TSS – 6720887693 (2018/10)
6.2
Installing the double-ended screws
WARNING:
Danger to life due to falling cylinder!
▶ Only screw double ended screws into a substructure with sufficient
load bearing capacity.
We recommend making a drilling template to ensure accurate vertical
drilling.
To create a drilling template:
▶ Drill
vertically
through the timber using a wood drill bit.
Fig. 14 Creating a drilling template
1. With a 14 mm drill bit, drill through the peaks of the roof tile.
However, do not drill into the timber below!
2. With a 6 mm wood drill bit, drill absolutely vertically through the
drilling template [1] and substructure.
Fig. 15 Drilling through roof tile and timber
NOTICE:
Roof leaks from damaged sealing washer!
▶ Only screw the nut over the sealing washer
hand-tight
onto the flat
washer.
▶ Turn the pre-assembled double-ended screw on the retaining block
with a 19 mm spanner until dim. Z (
tab.) is reached.
▶ Tighten the nut [2] by hand until the sealing washer [4] makes full
contact with the roof tile. Retighten nut with a ¼ to ½ turn of a
spanner.
Fig. 16 Fitted double-ended screw with retaining block
[1]
Retaining block
[2]
Nut M12
[3]
Washer
[4]
Sealing washer
[5]
Double-ended screw M12 × 180 mm
Table 13 Dim. Y and Z
63043965.23-1.SD
63043965.23-1.SD
0010015740-01
0010015740-01
14 mm
1.
6 mm
2.
90°
1
Roof tile height, dim. Y
Dim. Z
35 mm
max. 70 mm
40 mm
max. 65 mm
45 mm
max. 60 mm
50 mm
max. 55 mm
55 mm
max. 50 mm
60 mm
max. 45 mm
0010015741-02
0010015741-02
Y
Z
0 mm
1
9
1
2
3
4
5
Содержание TSS Series
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...