14.4
Commissioning and parameterization
Checklist to commission and parameterize the module
Device type, equipment ID
Version: HW/FW
Date
Editor
Tester
Notes
No. Request (mandatory)
Yes
Notes
1
Was the commissioning performed acc. to the
specifications (specifications from the planning
phase or acc. to the user manual)?
□
2
Is a purposeful start of hazardous motions on‐
ly possible during commissioning when the
danger zone can be seen?
□
3
Are all parameters parameterized for the out‐
puts and is the NTE set correctly?
□
4
Are the outputs parameterized as dual-chan‐
nel parameterized in a way that they match
each other?
□
5
Are the test pulses of the outputs parameter‐
ized depending on the actuator connected?
□
6
Was the switch-off delay for stop category 1
considered when calculating the total re‐
sponse time of the machine or system?
□
No. Request (optional)
Yes
No
Notes
7
Are the safety distances to be maintained
measured acc. to the triggering and delay
times (response times)?
□
□
Date
Signature (edi‐
tor)
Date
Signature (test‐
er)