14
Checklists
14.1
General information
The checklists listed in this chapter support the following actions at the mod‐
ule S20-SSDO-8/3: Planning, mounting, electric installation, commissioning,
parameterization as well as validation
These checklists can be used for planning and or as a proof of
performed working steps in the specified phases.
Archive the filled out checklists to use them as reference when performing re‐
curring checks.
This checklist does not replace validation, initial commissioning as well a reg‐
ular check by qualified staff.
The following excerpt shows a filled out list as example.
Checklist...
Device type, equipment ID
S20-SSDO-8/3 / S20-S3-BK+
Version: HW/FW
00/1.01
Date
17/01/2014
Tester 1
John Doe
Tester 2
Jane Doe
Notes
System XXX was checked for hood manufacturing
No. Request (mandatory)
Yes
Notes
X
...
□
No. Request (optional)
Yes
No
Notes
Y
...
□
□
Equipment ID
Enter device type and/or equipment ID for the ob‐
served module.
Version: HW/FW
Enter hardware and firmware version of the module,
refer to
chapter 3.2 "Module structure" on page 11
Date
Enter the date when this list was started.
Tester 1/2
Enter the name of the tester.
Notes
Enter the note if required.
Request (mandatory) These requirements are mandatory for a safety appli‐
cation to complete the corresponding phase with the
checklist.
Request (optional)
These requirements are optional. Enter a note if any
points are open (cannot be fulfilled).