
6 720 645 347 (2010/09)
76
|
Commissioning report for the heating system
12 Commissioning report for the heating system
Customer/System user:
System installer:
Date commissioned:
FD (Date of manufacture):
Number of heating circuits:
Domestic hot water systems:
1:
mixed/
non-mixed, FR 100
/FR 110
: Combi boiler
2:
mixed/
non-mixed, FR 10
/FR 100
: Cylinder connected to heating appliance
3:
mixed/
non-mixed, FR 10
/FR 100
: Cylinder on low loss header
4:
mixed/
non-mixed, FR 10
/FR 100
IPM module:
5:
mixed/
non-mixed, FR 10
/FR 100
Code 3
, type IPM 1
, IPM 2
6:
mixed/
non-mixed, FR 10
/FR 100
Code 4
, type IPM 1
, IPM 2
7:
mixed/
non-mixed, FR 10
/FR 100
Code 5
, type IPM 1
, IPM 2
8:
mixed/
non-mixed, FR 10
/FR 100
Code 6
, type IPM 1
, IPM 2
9:
mixed/
non-mixed, FR 10
/FR 100
Code 7
, type IPM 1
, IPM 2
10:
mixed/
non-mixed, FR 10
/FR 100
Code 8
, type IPM 1
, IPM 2
Solar thermal system
Code 9
, type IPM 1
, IPM 2
Solar options: E
Code 10
, type IPM 1
, IPM 2
The following work has been carried out
Switch off Auto switch between GMT - BST;
Water circulation systems checked Remarks:
Electrical connections checked Remarks:
Automatic configuration completed; remarks:
Heating circuits (IPM) configured; remarks:
DHW system configured; remarks:
Solar thermal system configured and commissioned; remarks:
Appliance function checked
Customer/system operator instructed how to operate the appliance
Appliance documentation handed over
Signature of system installer and date: