RAID Subsystem DVA-12T
Installation Procedures | en
55
Bosch Sicherheitssysteme GmbH
Quick Installation Guide
F.01U.027.801 | V5 | 2010.06
3
Installation Procedures
To install the subsystem use the following steps:
1.
Unpack the Subsystem (see
Section 4 Unpacking the Subsystem
)
2.
Install the system in the rack (see
Section 5 Rack Mounting
)
3.
Install the Drive Tray (see
Section 6 Drive Tray Installation
)
4.
Connect the Subsystem Cable (see
Section 7 Subsystem Cable Connections
)
5.
Power On (see
Section 8 Power On
)
6.
Configure the Host Computer (see
Section 9 Configuring the Host Computer via a Network
)
7.
Change the IP Address (see
Section 10 Changing the Configuration via a Web Browser
)
8.
Change the factory default settings (see
Section 10.2 Guidelines for Setting up a RAID
)
9.
Connect a Bosch Video Server (see
Section 12 Connecting a Bosch Video Server
)
4
Unpacking the Subsystem
Check the included Unpacking Checklist and verify the model name and shipping contents
against the checklist.
5
Rack Mounting
Slide rails are required for rack mounting. For rack mounting use only one of the following
slide rail kits:
Table 5.1
Slide rail kits
DVA-12T
Slide rails for 533 mm to 724 mm deep racks
(21" to 28.5")
DVA-ASRK-28A
Slide rails for 647 mm to 914 mm deep racks
(25.5" to 36")
DVA-ASRK-36A
NOTICE!
Refer to Slide Rail Kit Installation Manual for detailed information.