40
Schedule Overview
Schedule
u
To add a new Schedule, use the ‘+’ button in the top right
hand corner, name your schedule and click OK.
u
To modify an existing Schedule, select a Schedule from the
list and click Next.
Add a New Period
To add a new Period to a
given day, click the Add
Period button in the middle
of the screen and then
individually select and set
Starting time, Heat setpoint
and Cool setpoint.
Edit an Existing Period
To edit an existing Period,
click on the Starting, Heat or
Cool value you would like to
edit and use the scroll wheel
to update the value.