background image

TWH-TK-01

page 4 of 4

rev 01/06

Bosch Water Heating

340 Mad River Park, Waitsfield, VT 05673

©

BBT

 NORTH AMERICA

Bosch Group

Vent terminal
 (FX HOOD)

VENT CONNECTIONS

The vent system must be gas tight. All seams and joints must be sealed withhi temp silicone sealant or metal
tape having a minimum temperature rating of 400º F. For best results, a horizontal vent system should be as

short and straight as possible with Single wall Galvanized steel or Stainless steel vent pipe.

The entire vent system must not exceed the size specified below.

Horizontal & Vertical Venting

Diameter

Max. No. of Elbow

Max. Vertical or Horizontal run in Length

4"

3 Ea.

21 ft

For each additional elbow added, deduct 5 ft. from max. vent length.

FOR SIDEWALL VENTING: When a horizontal vent run exceeds 5 ft the following criteria must be observed ;

Attach a vertical pipe at least  2" high to the water heater outlet before the horizontal run.

Support the vent run at 3 ft intervals with overhead hanger.

Pitch up the vent run toward the vent terminal at a rate of 1/ 4" per foot.

Piping side

Min. 6"

Front (Maintenance space)

Min. 4" (24” suggested for maintenance space)

Floor

Noncombustible base for either floor or wall mount

Back of heater

1"

Non piping side

Min. 2"

Top of heater

11"

 

 

Vent Termination

A side wall vent terminal must be used when the water heater is vented through a side wall. Use part
No. FX HOOD. The hood provides a means of installing vent pipe through the building wall and must be
located in accordance with ANSI Z223.1 and local applicable codes.

Wall support brackets (needed if  wall hanging) must be used.  Use part No. 240bracket

Wall support
brackets
(240 bracket)

240FX

Содержание BBT NORTH AMERICA AquaStar 240FX

Страница 1: ...osch Group OUTSIDE INSTALLATION Follow all local codes and in the absence of local codes follow the National Fuel Gas Code ANSI Z221 23 in USA or in Canada CAN CGA B149 1 or 2 Installation of Gas Burning Appliances Locate the water heater in an open unroofed area and maintain the following minimum clear ances from combustible and noncombustible materials Piping side 12 Front Maintenance space 24 F...

Страница 2: ...G Do not have the flue terminal pointing toward any opening into a building Do not locate your heater in a pit or location where gas and water can accumulate WARNING Do not install the heater where water debris or flammable vapors may get into the flue terminal This may cause damage to the heater WARNING In the USA do not install the heater with the vent within 4 feet of any opening into a buildin...

Страница 3: ... IN The area indicated is for one of two openings one at floor level and one at ceiling so the total net free area would be double the figures indicated Outside air supply when combustion air is supplied directly through an outside wall such as intake louvers openings into the dwelling Each opening should give a minimum free area of one square inch per 4000 BTUH input of the total input rating of ...

Страница 4: ...EWALL VENTING When a horizontal vent run exceeds 5 ft the following criteria must be observed Attach a vertical pipe at least 2 high to the water heater outlet before the horizontal run Support the vent run at 3 ft intervals with overhead hanger Pitch up the vent run toward the vent terminal at a rate of 1 4 per foot Piping side Min 6 Front Maintenance space Min 4 24 suggested for maintenance spac...

Отзывы: