1 695 102 028
2014-10-10
|
Robert Bosch GmbH
Commissioning | TCE 330-TCE 230 | 25
4.1
Unpacking
1.
Remove the strap and securing clamps from the
pallet as well as the cardboard packaging.
i
After unpacking, check that the TCE 330-TCE 230 is in
perfect condition and that none of the components
exhibit any signs of damage. In case of doubt, do not
perform commissioning and call in a qualified engineer
and/or the seller of the machine.
2.
Take the standard accessories and the packaging ma-
terial out of the transportation crate.
i
Dispose of the packaging material in the proper man-
ner at an appropriate collection site.
en
4.
Commissioning
4.2
Installing the device
i
If present, remove the plastic covers at the bottom of
the tire changing machine's column.
i
The next work steps require a suitable crane to lift the
TCE 330-TCE 230.
Fig. 2:
TCE 330
TCE
230
4.2.1
Installing the device on the right-hand
side TCE 330
1.
Secure the support in the rear right corner of the
tire changing machine's housing using three bolts.
¶
Tightening torque: 65 N*m
i
Ensure that the bow's surfaces are accurately aligned
with the surfaces of the housing.
Fig. 3:
Support (housing)
Содержание 1 695 901 804
Страница 2: ......
Страница 259: ...1 695 102 028 2014 10 10 Robert Bosch GmbH 技术数据 TCE 330 TCE 230 259 zh ...