9
2. Delivery specification
- Force transmitter, type LPX 100 with connector cable, test range 0...100 kN
- 4 off, cheese head screws with hexagon socket DIN 912 - M 6 x 12 - 8.8
for fastening force transmitter to force measurement device 0 986 612 878
- Manual indicator type MMV22
- Fastening bracket for manual indicator
- 2 off 9 V block storage batteries (NiCd 9 V / 150 mAh) for voltage supply
- Charger for 9 V block storage battery
- Operating instructions
- Plastic case
3. Available service parts
- Operating instructions
0 986 629 323
4. Operation with storage battery
The voltage supply is established using a 9 V block storage battery.
Do not apply an external voltage source!
Prior to the first start up, both storage batteries should be charged using the charger which
is included as part of the delivery specification.
Charging will take roughly 2...3 hours for a completely empty storage battery.
During the charging process the charger's LED will go on.
Once the storage battery is charged, the charger will switch to maintenance charge and
the LED on the charger starts to flash on and off. It is not possible to overcharge the
storage battery.
The capacity of a charged storage battery will suffice for 3 hours of operation.
If the storage battery level drops below a specific minimum value, the following is
displayed in the manual indicator “
+1.::. ”
. In this case, replace the storage battery
immediately and charge it.
Used and faulty batteries should not be disposed off with domestic waste.
Ensure they are disposed off in an environmentally compatible manner.
5. Operation with power pack
As an option the voltage supply can also be provided by means of a power pack, which is
connected to the power pack plug socket on the manual indicator.
Where a power pack is used then the power pack characteristic values
must
be observed;
they are available in
Section 9.3
.
6. Calibration
As part of your quality management (see QA Manual) the defined
for calibration
must
be observed.
Recommendation:
Every 24 months
English