background image

- 8 -

Holes

Must

Align

Saddle

STEP 6

SECTION LEVELING

Where required, level sections with shims to cause each upright assembly to

be plum within 1/10" inch per foot of height.

FAILURE TO LEVEL SECTIONS COULD RESULT IN

SHELVING COLLAPSE, PERSONAL INJURY

AND/OR COMMODITY LOSS.

MAJOR ACCESSORIES

SHELF SIDE SUPPORTS

Tabs hook into front and rear posts in the same manner as shelf clips. Side

flange of shelf rests on top flange of shelf side support.

SHELF REINFORCEMENT SADDLES

Install under center of shelf, flanged side up. Turn slightly to clear shelf side

flange and then rest on side flanges. Must be used in conjunction with shelf

side supports.

Shelf Side Support

STEP 7

TIGHTEN ALL BOLTS

Tighten all bolts and add the intermediate shelves to complete the sections.

LEDGE TYPE  SHELVING

Ledge sections, 3'3" high, are bolted to the front of a full height section. The

bolts are fastened through the fourth hole from each end.

Bolt Through Fourth Hole

with 1/4-20 x 5/8 Hex Head

Cap Screw (Grade 5) and

Hex Nut

Ledge Section

Full Height Section

Shims

Front and/or Rear

Содержание Box Edge Plus

Страница 1: ...or shelf loading Vital product information pertaining to proper set up safe loading and cau tions are included Failure to follow these instructions may cause shelving failure which may result in perso...

Страница 2: ...ad across the aisle to an opposite upright assembly LENGTH OF RUN Actual length of beaded post shelving run in nominal unit width per unit plus 1 2 for each row end Actual length of angle post shelvin...

Страница 3: ...ndirect incidental or consequential damages arising in any way from a product defect This warranty is exclusive and exists in lieu of all other warranties either expressed or implied This warranty giv...

Страница 4: ...sts The brace bolts on the inside of the long flange Refer to pages 10 and 11 for the approximate proper location of the braces Repeat this procedure until all row ends are assembled Pre determine cri...

Страница 5: ...s of the back brace are now bolted on the inside of the short flanges of each upright at the same level and spacing as the previously installed side braces Steps 2 and 3 DO NOT TIGHTEN BOLTS STEP 5 BA...

Страница 6: ...al has been distributed to the proper location determine from the floor plan how many row end closed upright assemblies and intermediate closed upright assemblies will be required The row ends exist a...

Страница 7: ...IS PLAIN UNPUNCHED FOR AESTHETICS AND ONE FACE EDGE IS PUNCHED TO ACCEPT FULL WIDTH SHELF LABEL HOLDERS STEP 5 ROW ASSEMBLY Continue adding intermediate closed upright assemblies and backs until row i...

Страница 8: ...side support SHELF REINFORCEMENT SADDLES Install under center of shelf flanged side up Turn slightly to clear shelf side flange and then rest on side flanges Must be used in conjunction with shelf sid...

Страница 9: ...6 high bin fronts are generally bolted to post front flange hardware furnished or optional bolt on clips may be used SHELF DIVIDERS FULL HEIGHT Install beaded edge toward front Fasten in place with a...

Страница 10: ...be installed in each open end and open back Sway brace height is as shown in Figure 6 Figure 6A and 6B are an end and an intermediate respectively The bracing patterns are opposite each other and sho...

Страница 11: ...2 1 4 20 Hex Nut 2 Bin Front 1 4 20 x 1 Slotted THMS 2 3 6 Angle Post 1 4 20 Hex Nut 2 Bin Front 1 4 20 x 5 8 HHMS Gr 5 2 1 1 2 3 6 1 4 20 Hex Nut 2 Beaded Post Bin Front Clip 1 4 20 x 5 8 HHMS Gr 5...

Страница 12: ...uilding Code copyright 1997 with the permission of the publisher the International Conference of Building Officials ICBO and Borroughs assume no responsibility for the accuracy or the completion of su...

Отзывы: