EN
4
General
www.bora.com
INFO
BORA Holding GmbH, BORA Vertriebs
GmbH & Co KG, BORA APAC Pty Ltd and BORA
Lüftungstechnik GmbH - hereinafter referred
to as BORA - shall not assume any liability for
damage caused by non-compliance with these
documents nor by improper assembly!
The electricity and gas connections must be
implemented by a certified engineer.
Assembly must only take place in compliance
with the applicable norms, regulations and
laws. All safety and warning information and
handling instructions in the operating and
assembly instructions must be followed.
Validity of the operating and assembly
instructions
This manual is valid for several versions of the device. For
this reason, it is possible that individual features are
described in the manual that do not apply to your device.
Other applicable documents
Additional documents are valid as well as these operating
and assembly instructions, and likewise need to be obser-
ved.
Please observe all documents included in the scope of
delivery.
INFO
BORA cannot assume any liability for damage
caused by non-compliance with these docu-
ments!
Guidelines
These devices meet the following EC guidelines:
2004/108/EC EMC Directive
2006/95/EC Low-Voltage Directive
2009/125/EC Ecological Design Directive
2011/65/EC RoHS Directive
1 General
Target group
These operating and assembly instructions are intended
for the following target groups:
Target group
Requirements
Users
The Device may be used by chil-
dren from the age of 8 as well as
by people with limited physical,
sensory or mental capabilities or a
lack of experience and/or knowl-
edge, provided they are super-
vised, have been instructed in the
safe use of the device and have
understood the dangers involved.
Children must be supervised. All
safety and warning information
and handling instructions in the
operating manual must be fol-
lowed.
Ambitious Diyers
Ambitious Diyers may carry out all
the necessary carpentry and
assembly work themselves provi-
ding that they have the necessary
skills and knowledge. They must
not connect the current and gas
themselves.
Assembly
expert
The assembly expert must carry
out all the necessary carpentry
and assembly work taking existing
regulations into account. The cur-
rent and gas connections must be
approved for the system in use by
a certified electrician before use.
Electrical
expert
The electrical connection must
only be executed by a certified
electrician. He/she also assumes
responsibility for the proper elec-
trical installation and commission-
ing.
Expert
gas connection
The gas connection must only be
implemented by a certified gas
engineer. He/she also assumes
responsibility for the proper gas
installation and commissioning.
Tab. 1.1: Target groups
Содержание CI11
Страница 26: ...EN 26 Notes www bora com GB 11 Notes...
Страница 27: ......