3
Unpack and set machine upright.
Put the machine on a horizontal surface.
Plug in the machine.
The socket-outlet should be installed near the equipment and shall be easily
accessible
Installa
Please check the voltage of your shredders carefully before using.
On the top of the shredder, there are three (3) se
UTO, OFF and REV.
1. When
AUTO
is selected, the shredding process is started automa ally by
to the feed opening. The shredder will stop automa ally
when the paper has completed its travel through the feed opening.
2.
REV
is used to assist in the removal of a paper jam, which reverses the shredder
process prior to a completed cy
ers. If you want to stop
shredding the paper, please set it to reverse. The machine will reverse
automa ally and turn back the papers.
3.
OFF
is used to terminate the power to the shredder. This mode is recommended
when emptying the wastebasket or when the shredder is not in use for a
prolong
Opera
edder
C169-B will shred fourteen(14) sheets of A4 size 75g/m² paper at once and will
accept paper widths up to 8.66 inches. When shredding small material like
envelopes or receipts, insert them through the middle of the feed opening.
Shredder capacity
C169-B is equipped with a motor overheat prot
echnology
er
con
erheat' LED indicator lights up. Please
remember to stop the machine from working a er the 'Overheat' LED indicator
lights up. Please wait and allow the machine to cool down and restart when the
'Overheat' LED indicat
or turns off
.
Overheat Prot