
XC 061-AAM.02-MANUAL Rev.03
10
1)
Water inlet
2)
Main body
3)
Identifi cation plate
4)
Stem
5)
Nozzle-holder
6) DIAGRAM OF THE ASSEMBLY
7) INSTALLATION AND COMMISSIONING
Before you actually start the system, you are recommended to purge it to
eliminate any sludge or impurities. Breakages or problems caused by soiling
will not be accepted under warranty.
On the head inlet install a safety valve set at the maximum pressure shown
on its mark or at page 8 of this manual.
7.1) Put the head (1) in the container to be washed.
7.2) Secure the head to the container via the fl ange (2). Contact the manufacturer for special
fl anges.
Fig. 6.0
2
1
3
4
5
Содержание XC 061-AAM.04
Страница 27: ...XC 061 AAM 02 MANUAL Rev 03 27 ...