background image

Hot Water Products, Inc.  

·

  7500 N. 81st Street, Milwaukee, WI 53223  

·

  Toll-free: 877 377•0011  

·

  Fax: 877 280•0022  

·

  www.BoilerBuddy.com

©2014 Hot Water Products, Inc.  We reserve the right to make product changes without notice and will not be held liable for typographical errors in 
literature.  Boiler Buddy® is a registered trademark of Hot Water Products, Inc. Rev. 11/17.

A division of:

Содержание BB-119-3W

Страница 1: ...ided for monitoring and controlling tank temperature Closed cell foam insulation provides low standby loss Large tank connections accommodate flow rates required by low mass equipment Installation Man...

Страница 2: ...rate information however Hot Water Products assumes no responsibility and will not be liable for any errors omissions damage or loss that might result from any use of this manual or the information co...

Страница 3: ...0 with Boiler Indirect Water Heater 5 BB 30 with Boiler Indirect Multi Temp 6 BB 50 G with Geo Thermal 7 BB 80 3W with Two Boilers Indirect 8 BB 80 C with Boiler Wood Boiler 9 BB 80 C with Geo Thermal...

Страница 4: ...so creates a low velocity state within the system providing air elimination assisting in the removal of sediment and debris and acting as a hydraulic separator between required flows from the boiler s...

Страница 5: ...l integrity and retards water and moisture thereby increasing the longevity of the tank WARNING Boiler Buddy buffer tanks are NOT suitable for non oxygen barrier tubing NOT suitable for potable water...

Страница 6: ...hydronic buffer tank heat supplemented by solar geothermal wood boiler pellet stove waste oil burner etc Carbon steel coil is 36 long 14 4 ft2 and furnished with 1 NPT connections 3 Boiler Buddy Inst...

Страница 7: ...onnections are reversed the system supply temperature could be tempered within the tank To achieve maximum set point feed the boiler supply into the top tapping Drawing is meant to show system piping...

Страница 8: ...5 Boiler Buddy Installation Manual Drawing is meant to show system piping concepts only Installing contractor is responsible for all equipment and detailing required by local codes...

Страница 9: ...Drawing is meant to show system piping concepts only Installing contractor is responsible for all equipment and detailing required by local codes REV 7 16 6...

Страница 10: ...7 Boiler Buddy Installation Manual Drawing is meant to show system piping concepts only Installing contractor is responsible for all equipment and detailing required by local codes...

Страница 11: ...Drawing is meant to show system piping concepts only Installing contractor is responsible for all equipment and detailing required by local codes REV 7 16 8...

Страница 12: ...alling contractor is responsible for all equipment and detailing required by local codes WARNING The internal coil in the BB 80 C tank is made of carbon steel This must only be connected to closed loo...

Страница 13: ...sponsible for all equipment and detailing required by local codes REV 7 16 10 WARNING The internal coil in the BB 80 C tank is made of carbon steel This must only be connected to closed loop pressuriz...

Страница 14: ...talling contractor is responsible for all equipment and detailing required by local codes WARNING The internal coil in the BB 80 C tank is made of carbon steel This must only be connected to closed lo...

Страница 15: ...Drawing is meant to show system piping concepts only Installing contractor is responsible for all equipment and detailing required by local codes REV 7 16 12...

Страница 16: ...1 Fax 877 280 0022 www BoilerBuddy com 2014 Hot Water Products Inc We reserve the right to make product changes without notice and will not be held liable for typographical errors in literature Boiler...

Отзывы: