background image

4

Assembly of the upper supports

 

Place a slightly inclined upper support at the end of the crossbeam.

Press the plate carrier into position until a click is heard.

Make sure that the upper supports are correctly positioned and cannot be twisted 

by the DF2 support.  

Fix the DF2 frame to the desktop with 20 screws:  

8 screws at the ends of the support (A)

Use one of these screws to fix the mains cable to the support with the cable clamp to 

provide strain relief for the cable, see sketch 1. 

12 screws in the crossbeam (B)

a

c

c

c

c

b

a

Place the assembled DF2 frame in the correct position.

Use a tape measure to measure the central position of the DF2 frame on the 

desktop. 

A

A

A

A

B

B

B

1

Содержание EASYDESK LINE

Страница 1: ...5 YEAR WARRANTY 0 1W STANDBY CONSUMPTION APP CONTROL PLUG AND PLAY ASSEMBLY CUSTOMER SUPPORT EASYDESK LINE EASYDESK LINE ASSEMBLY INSTRUCTIONS ...

Страница 2: ... design The lifting columns have no visible sliders and no holes in the profile Due to the internal cabling and the pre installed motor in the carrier only the mains cable and the connection cable to the control unit are visible The table frame quality and performance resembles other three part lifting columns It is equipped as standard with the new Desk Sensor anti collision technology which ensu...

Страница 3: ...e connection end is 100 mm to keep the power supply and the RJ45 sockets accessible otherwise adjustable in steps of 50 mm Fixing the crossbeam Extend the crossbeam to the desired length width from 1 150 to 1 750 mm extensionable in 50 mm steps Checking the contents Have all parts for the desk ready including the desktop ...

Страница 4: ...sted by the DF2 support Fix the DF2 frame to the desktop with 20 screws 8 screws at the ends of the support A Use one of these screws to fix the mains cable to the support with the cable clamp to provide strain relief for the cable see sketch 1 12 screws in the crossbeam B a c c c c b a Place the assembled DF2 frame in the correct position Use a tape measure to measure the central position of the ...

Страница 5: ...he column is pulled out while turning it over push it by hand to the fully retracted position Attach the column to the crossbeam by pushing it down until a click is heard and both claws lock the column in the correct position After assembling the columns check that both claws are visible ...

Страница 6: ...or into one of the RJ45 jacks it doesn t matter which Fix the operating unit to the desktop with the screws supplied Make sure that you use the cable clamp to relieve the strain on the cable when attaching the cable to the desktop see step 4 Connecting the power cable Plug the mains cable into the socket ...

Страница 7: ... M8 threaded holes Always use four M6 or two M8 screws with the following specifications to mount the runners Quality min class 8 8 Length min 10 mm plus feet thickness max 16 mm plus feet thickness Turn the desk over 2 people please Connect to the mains Your desk is ready for use Fit the adjustment glides Plug the mains cable into the socket ...

Страница 8: ...hich you want to move the table The DPG stops at the first stored position in the selected direction How to save up to 4 memory positions and reset the memory The DPG with display can store up to 4 memory positions Move the table to the required height and press the star key until the display shows either star 3 or star 4 Release the key again To save a position press the star key and hold it down...

Страница 9: ...shing white The position has been saved when it is permanently lit To move the table to a memory position press and hold the panel Automatic movement between two memory positions Activate the Automatic procedure function in the Desk Control App Briefly press the Desk Panel twice in the direction you wish to move the desk the desk will automatically move to the position you have saved Reminder func...

Страница 10: ...s Possible problem Do cables controls control unit or deskframe legs show visible damage Solution Damaged parts must be replaced Please contact us Setting the correct table height Switching between inches and centimetres Setting the correct table height If the height shown on the display does not correspond to the actual height of the table it can be corrected Measure the height of the table from ...

Страница 11: ... responsible for compliance could void the user s authority to operate the equipment Declaration for Class B digital devices NOTE This equipment has been tested and found to comply with the limits for a Class B digi tal device pursuant to Part 15 of the FCC Rules These limits are designed to provide reason able protection against harmful interference in a residential installation This equipment ge...

Страница 12: ...e car ried out by children Persons who do not have the necessary experience or sufficient knowledge of the pro duct s must not use them Physically and mentally disabled persons may not use the product unless they are supervised or have received thorough instruction in the use of the equipment from a person responsible for the safety of such persons Children must be supervised to ensure that they d...

Страница 13: ...turer Linak it is available in the Apple and the Google App Store You can either install the app using the QR Codes below or search for the Desk Control app in the respective App Store For installation and connection please follow the steps in the app ANDROID APPLE ...

Страница 14: ...embly video for Easydesk Line frame scan the QR Code and start or search for Assembly Easydesk Line on Youtube Customer Service boho office is a registered trade mark of the boho möbelwerkstatt GmbH Our customer service can be reached on 05244 9789030 Mo Fr from 08 00 17 00 Email info boho moebel de ...

Отзывы: