BOH Enviromental FPU SYSTEMS 99000457-UG Скачать руководство пользователя страница 9

 

BOH-PM-04-1 

Chapter 1 Rev. 2.00 

iii 

 

  

 

HOW TO USE THIS MANUAL 

 

This manual contains general information, operating instructions, Preventative Maintenance Checks and Services (PMCS), and 

maintenance/repair instructions for the BOH Containerized Shower Units. 

 

Front matter consists of front cover, warning summary, title block, table of contents, "how to use this manual" pages, and 

provides information on the BOH Containerized Shower Units and their associated equipment.  Chapter 1 provides equipment 

description and data as well as the theory of operation.  Chapter 2 provides instructions for operating under usual and 

unusual conditions.  Chapter 3 contains troubleshooting procedures authorized at the Operator and Unit level.  Chapter 4 

contains Preventative Maintenance Checks and Services (PMCS) and Operator Maintenance Instructions.  Chapter 5 

contains Unit Maintenance Instructions.  Chapter 6 contains the Maintenance Allocation Chart (MAC); it also includes the 

Repair Parts & Special Tools List (RPSTL) that identifies parts or tools unique to the operation and maintenance of the 

showers

.   

 

Manual Organization and Page Numbering 

 

This manual is divided into six major chapters that detail the topics mentioned above.  Within each chapter are work 

packages covering a wide range of topics.  Each work package is numbered sequentially at page 1, and has its own page 

numbering scheme that is independent of the page numbering used by other work packages.  Each page of a work package 

has a page number of the form "XXXX YY-ZZ", where "XXXX YY" is the work package number (e.g.  0010 00 is work 

package 10) and "ZZ" represents the number of the page within that work package.  Blank pages will be labeled “This page 

was intentionally left blank”. 

 

Finding Information 

 

The Table of Contents permits the reader to quickly find information in the manual.  The reader should start here first when 

looking for a specific topic.  The Table of Contents lists the topics contained within each chapter and the work package 

sequence number where it can be found. 

 

Types of notations 

 

Warnings

 - Warnings are posted immediately prior to text covering any area that would present a situation that may result in 

injury or death.  Compliance is mandatory. 

 

Cautions

 - Cautions will be found on the same page and preceding the text covering any area that would present a situation 

that may result in damage to equipment. 

 

Notes

 - Notes will precede text covering an area with the intent to alter normal procedures for unique situations or 

equipment, or point out areas of special concern. 

 

 

 

 

 

 

 

 

 

 

Содержание FPU SYSTEMS 99000457-UG

Страница 1: ...ATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units BOH CONTAINERIZED SHOWER BOH FPU Systems BOH ENVIRONMENTAL LLC 143 Terra Bella Blvd...

Страница 2: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 3: ...BOH Containerized Shower When working with ground guides during the loading or unloading of the BOH Containerized Shower onto the selected site do not allow the ground guide between the forks and the...

Страница 4: ...t to prevent spillage and slippery surfaces Spills from the shower or sink must be cleaned up immediately Failure to comply could cause injury from a fall WARNING The Shower components can be heavy an...

Страница 5: ...EAVY PARTS foot with heavy object on top shows that heavy parts can crush and harm SLICK FLOOR wavy line on floor with legs prone shows that slick floor presents a danger for slipping or falling HEAVY...

Страница 6: ...BOH PM 04 1 Chapter 1 Rev 2 00 a This page was intentionally left blank...

Страница 7: ...ation 0002 00 Equipment Characteristics Components and Features 0003 00 Equipment Data Labels Identifications Markings 0004 00 CHAPTER 2 OPERATOR INSTRUCTIONS Preparation for Movement 0005 00 Operatio...

Страница 8: ...Containerized Shower Repair Parts List 0033 00 Group Numbers 00 Containerized Shower System 01 Containerized Shower 0101 Door Assemblies 0102 Water and Waste caps 02 External Electrical 0201 Internal...

Страница 9: ...that detail the topics mentioned above Within each chapter are work packages covering a wide range of topics Each work package is numbered sequentially at page 1 and has its own page numbering scheme...

Страница 10: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 11: ...Chapter 1 Rev 2 00 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY O...

Страница 12: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 13: ...wer unit is easily loaded and unloaded by forklift rated for 10 000 lb The containerized shower consists of an 8 wide x 20 long x 8 5 high sturdy metal container with a pallet like base It has five in...

Страница 14: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 15: ...vidual shower compartments with doors with security and privacy locks shower fluorescent lighting sink exhaust fan vanity cabinet with mirror The utility room contains the 80 gal electric hot water sy...

Страница 16: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 17: ...DUCTORY INFORMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT CHARACTERISTI...

Страница 18: ...2 Shower Top View Layout NOTE The electrical and water connection end is recessed 3 to keep within the container profile Ground rod and strap assembly and city water valve are stored in the utility ro...

Страница 19: ...Box 120 240 Volt 1 Phase 40 AMP NEMA 3R 1 Weather Proof Exterior GFCI Receptacle 2 Ground rod and strap are stored in the left corner of the utility room Ground Lug 3 1 Cold Water Inlet 4 4 PVC Black...

Страница 20: ...0003 00 BOH PM 04 1 Chapter 1 Rev 2 00 0003 00 4 Grey Water Cleanout NOTE The Grey Water Cleanout 1 is located on the opposite end from the Load Center and water hookups END OF WORK PACKAGE 1...

Страница 21: ...RMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT DATA LABELS IDENTIFICATIO...

Страница 22: ...ific corrosion maintenance plan At a minimum equipment should be inspected for corrosion on a quarterly basis monthly if equipment is operated stored in a high salt air environment If corrosion is dis...

Отзывы: