background image

BOH-PM-04-1   

 

 

 

 

 

 

© 2016 BOH Environmental LLC 

Chapter 1 Rev. 2.00 

 

 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) 

BOH CONTAINERIZED 5 PERSON SHOWER  

BOH FPU Field Pack-up Units 

 

 

 

                                 

 

BOH CONTAINERIZED SHOWER 

BOH FPU

®

 Systems 

BOH ENVIRONMENTAL LLC 

143 Terra Bella Blvd. 

Covington, LA 70433 

POC Doug Cresap (985) 674-0725 

http://www.bohfpusystems.com 

 

 

Содержание FPU SYSTEMS 99000457-UG

Страница 1: ...ATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units BOH CONTAINERIZED SHOWER BOH FPU Systems BOH ENVIRONMENTAL LLC 143 Terra Bella Blvd...

Страница 2: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 3: ...BOH Containerized Shower When working with ground guides during the loading or unloading of the BOH Containerized Shower onto the selected site do not allow the ground guide between the forks and the...

Страница 4: ...t to prevent spillage and slippery surfaces Spills from the shower or sink must be cleaned up immediately Failure to comply could cause injury from a fall WARNING The Shower components can be heavy an...

Страница 5: ...EAVY PARTS foot with heavy object on top shows that heavy parts can crush and harm SLICK FLOOR wavy line on floor with legs prone shows that slick floor presents a danger for slipping or falling HEAVY...

Страница 6: ...BOH PM 04 1 Chapter 1 Rev 2 00 a This page was intentionally left blank...

Страница 7: ...ation 0002 00 Equipment Characteristics Components and Features 0003 00 Equipment Data Labels Identifications Markings 0004 00 CHAPTER 2 OPERATOR INSTRUCTIONS Preparation for Movement 0005 00 Operatio...

Страница 8: ...Containerized Shower Repair Parts List 0033 00 Group Numbers 00 Containerized Shower System 01 Containerized Shower 0101 Door Assemblies 0102 Water and Waste caps 02 External Electrical 0201 Internal...

Страница 9: ...that detail the topics mentioned above Within each chapter are work packages covering a wide range of topics Each work package is numbered sequentially at page 1 and has its own page numbering scheme...

Страница 10: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 11: ...Chapter 1 Rev 2 00 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY O...

Страница 12: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 13: ...wer unit is easily loaded and unloaded by forklift rated for 10 000 lb The containerized shower consists of an 8 wide x 20 long x 8 5 high sturdy metal container with a pallet like base It has five in...

Страница 14: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 15: ...vidual shower compartments with doors with security and privacy locks shower fluorescent lighting sink exhaust fan vanity cabinet with mirror The utility room contains the 80 gal electric hot water sy...

Страница 16: ...BOH PM 04 1 Chapter 1 Rev 2 00 This page was intentionally left blank...

Страница 17: ...DUCTORY INFORMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT CHARACTERISTI...

Страница 18: ...2 Shower Top View Layout NOTE The electrical and water connection end is recessed 3 to keep within the container profile Ground rod and strap assembly and city water valve are stored in the utility ro...

Страница 19: ...Box 120 240 Volt 1 Phase 40 AMP NEMA 3R 1 Weather Proof Exterior GFCI Receptacle 2 Ground rod and strap are stored in the left corner of the utility room Ground Lug 3 1 Cold Water Inlet 4 4 PVC Black...

Страница 20: ...0003 00 BOH PM 04 1 Chapter 1 Rev 2 00 0003 00 4 Grey Water Cleanout NOTE The Grey Water Cleanout 1 is located on the opposite end from the Load Center and water hookups END OF WORK PACKAGE 1...

Страница 21: ...RMATION WITH THEORY OF OPERATION FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack up Units EQUIPMENT DATA LABELS IDENTIFICATIO...

Страница 22: ...ific corrosion maintenance plan At a minimum equipment should be inspected for corrosion on a quarterly basis monthly if equipment is operated stored in a high salt air environment If corrosion is dis...

Отзывы: