background image

 

Field Pack-Up (FPU

®

) Series 

 

 

 

                        

USER MANUAL FOR 

CCC  

CONTAINERIZED COMMAND CENTER 

EWCC  

EXPANDABLE WALL COMMAND CENTER 

User and General Purpose 

Maintenance Manual 

 

FPU

®

 SERIES

 

PART NUMBER 

NSN 

CONTAINERIZED COMMAND CENTER (TAN) 

CCC208-T 

8145-01-502-3930 

CONTAINERIZED COMMAND CENTER (GREEN) 

CCC208-G

 

8145-01-502-3930

 

 

 

FPU

®

 SERIES

 

PART NUMBER 

NSN 

EXPANDABLE WALL COMMAND CENTER (TAN) 

EWCC208-T 

8145-01-502-3927 

EXPANDABLE WALL COMMAND CENTER (GREEN) 

EWCC208-G

 

8145-01-502-3927

 

 

 

 
 

  

 

 

BOH Environmental, LLC 

 

FPU Mobility Systems Division 

 

                                                                       14520 Avion Parkway, Suite 220  

                                                                                   Chantilly, VA 20151 
Version 001A, 11 Nov 2005 

Ph: (703) 449-6020 Fax: (703) 449-6022

             

 

 

 

 

 

  

 

   
 

    

 

 

    

 

  

 

     

 

  

 

               

  

   

Содержание 8145-01-502-3927

Страница 1: ...TER TAN CCC208 T 8145 01 502 3930 CONTAINERIZED COMMAND CENTER GREEN CCC208 G 8145 01 502 3930 FPU SERIES PART NUMBER NSN EXPANDABLE WALL COMMAND CENTER TAN EWCC208 T 8145 01 502 3927 EXPANDABLE WALL...

Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 3: ...Field Pack Up FPU Series i Figure 1 1 1 BOH EWCC Data Plates Location...

Страница 4: ...Field Pack Up FPU Series ii Figure 1 1 2 BOH CCC Data Plates Location...

Страница 5: ...4 2 Loading and Unloading 9 4 3 CCC and EWCC Doors 10 4 4 EWCC Doors and Floor Plan 13 4 5 Red and White Light Conditions 13 4 6 CCC and EWCC HVAC 14 4 7 CCC and EWCC HVAC Latches 15 4 8 CCC and EWC...

Страница 6: ...ch Locations 14 Figure Page Figure 4 6 1 HVAC 15 Figure 4 7 1 HVAC Latches 16 Figure 4 8 1 CCC and EWCC Monitor Mounts 17 Figure 5 1 1 EWCC Workstation Setup 18 Figure 5 1 2 Pins and Ratchet Straps 18...

Страница 7: ...y moving parts present a danger to life or limb HEAVY PARTS hand with heavy object on top shows that heavy parts can crush and harm HEAVY PARTS foot with heavy object on top shows that heavy parts can...

Страница 8: ...E flame shows that a material may ignite and cause burns VAPOR human figure in a cloud shows that material vapors present a danger to life or health CHEMICAL drops of liquid on hand shows that the mat...

Страница 9: ...tines versus out on the tips A tilt situation exists when the heaviest part of the load is out on the tips of the tines on uneven ground with forks fully extended and while traveling Operators should...

Страница 10: ...pancies Additionally electrical power must be disconnected before any electrical system work is performed WARNING Protective gloves should be worn when handling metal parts in below freezing temperatu...

Страница 11: ...SECTION I INTRODUCTION AND GENERAL INFORMATION...

Страница 12: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 13: ...e command and control center that provides six expandable workstations 1 2 2 CCC and EWCC System Benefits The CCC and EWCC are air conditioned heated single rooms that provide file cabinets shelves wi...

Страница 14: ...is sufficient to perform minor repairs on the containers and modules Note All hardware is standard thread and removed with a Counterclockwise rotation and tightened with a Clockwise rotation WARNING P...

Страница 15: ...Field Pack Up FPU Series SECTION II CCC and EWCC COMPONENTS AND ACCESSORIES...

Страница 16: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 17: ...rovided with two entry doors and four desk workstations with a continuous top 1 Each workstation has two lockable file cabinets with four drawers 2 See Figure 2 1 1 2 1 3 The CCC has a centrally locat...

Страница 18: ...Field Pack Up FPU Series Figure 2 1 1 CCC Accessories Locations 1 2 3 4 5 6 7 8 4...

Страница 19: ...nection 2 2 2 The EWCC is provided with a main door 1 a secondary entry door 2 and three roll out workstation platforms 3 to provide six retractable desk workstations 4 See Figure 2 2 1 2 2 3 The EWCC...

Страница 20: ...Field Pack Up FPU Series Figure 2 2 1 EWCC Accessories Locations 1 2 4 3 6 5 8 7 9 6...

Страница 21: ...Field Pack Up FPU Series SECTION III CCC and EWCC PREPARATION FOR USE STORAGE MOVEMENT AND SHIPMENT...

Страница 22: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 23: ...ements Relatively level terrain soil and weather conditions such as mud ice snow sand and flood plane should be considered when selecting a site for the containers to insure safety of operating person...

Страница 24: ...the CCC and EWCC See Cleaning Table 6 1 1 3 2 4 Lubrication of all moving parts devices locks latches and hinges should be performed NOTE Lubrication and cleaning of the CCC and EWCC moving parts is...

Страница 25: ...Field Pack Up FPU Series SECTION IV CCC and EWCC SETUP AND OPERATIONS...

Страница 26: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 27: ...ves for printers CPU pop up monitor trays and 2 doors with automatic switch for low voltage white red light See CCC and EWCC Electrical Diagram in Section VII 4 2 Loading and Unloading A Crane may be...

Страница 28: ...e of the container See Figure 4 2 2 Figure 4 2 2 Forklift Pockets 4 3 CCC and EWCC Doors 4 3 1 The CCC and EWCC both have two common entrance doors and are provided with door dampers 1 and interior li...

Страница 29: ...ck system that consists of a large handle with a key 1 and piston 2 When engaged the piston 2 provides a positive locked position 3 to secure the door handle A door handle instruction plate 4 is provi...

Страница 30: ...ure 4 3 3 Door lock 4 3 5 Interior Door Lock The MWC door mechanism is design to allow exit while the exterior lock is engaged Pull door handle 2 upward to open See Figure 4 3 4 FIGURE 4 3 4 Interior...

Страница 31: ...Fig 4 3 2 5 and 4 4 1 6 4 5 2 They are used to set the red white lighting conditions 4 5 3 The left switch 1 sequence is as follows See Fig 4 5 1 1 The left switch in the Up position will select Door...

Страница 32: ...with latches to cover the unit during shipment or storage This door must first be unlatched 3 to allow the HVAC to be unlocked and pushed out into the operating position See Figure 4 6 1 CAUTON Do no...

Страница 33: ...ed to deploy the HVAC to the operating position See Fig 4 7 1 4 7 2 The latches in the locked position 1 must be pulled out and rotated downward to the released position 2 At this point the HVAC can b...

Страница 34: ...op 1 during storage and shipment See Figure 4 8 1 4 8 2 The monitor mounting tray 3 is supported by flexible springs 5 on either side of the monitor mounting tray 3 that allows easy positioning of the...

Страница 35: ...ower line 2 White wire shore power neutral Green wire shore power ground NOTE This is standard residential coloring A generator should have outputs labeled as L1 L2 N G or by color or both 4 9 4 The c...

Страница 36: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 37: ...Field Pack Up FPU Series SECTION V EWCC EXPANDABLE WORKSTATIONS...

Страница 38: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 39: ...rk area of the container Figure 5 1 1 EWCC Work Station Setup TOP VIEW 5 1 2 There are three workstations A B and C in the EWCC that can be deployed with relative ease by releasing the securing pins 1...

Страница 40: ...nt 5 2 1 Retracting and securing sequence for the three workstations is as follows 1 Remove the securing pins from workstation A with assistance from other personnel from the exterior of the container...

Страница 41: ...Field Pack Up FPU Series SECTION VI CCC AND EWCC MAINTENANCE GUIDE...

Страница 42: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 43: ...IL GREASE SALT MUD DIRT DEBRIS RUST CORROSION Exterior and Interior Surfaces All Detergent Water Rags Soapy Water Brush Rags Corrosion Removal Compound and Wire Brush Dry Rag Coat with Lube Oil or Spo...

Страница 44: ...g hardware Missing doors punctures damage that would cause hazard or injury Lubricate hinges locks floor rails as required 2 Exterior Check all exterior surfaces for cracks and dents that effect the o...

Страница 45: ...ment Service or Operation of the EWCC Workstations Table 6 6 1 Troubleshooting Checks FUNCTION CHECKS CCC EWCC Operation Section 4 3 EWCC Workstation will not roll out 1 Insure that the material store...

Страница 46: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 47: ...Field Pack Up FPU Series SECTION VII CCC and EWCC ELECTRICAL COMMUNICATION DIAGRAMS...

Страница 48: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 49: ...Field Pack Up FPU Series SECTION VII CCC AND EWCC ELECTRICAL COMMUNICATION DIAGRAMS 7 1 EWCC Electrical and Communication Diagrams Figure 7 1 1 EWCC Top Layout 23...

Страница 50: ...Field Pack Up FPU Series...

Страница 51: ...Field Pack Up FPU Series Figure 7 1 2 AC Side Layout 24...

Страница 52: ...Field Pack Up FPU Series...

Страница 53: ...Field Pack Up FPU Series Figure 7 1 3 EWCC Load Center Layout 25...

Страница 54: ...Field Pack Up FPU Series...

Страница 55: ...Field Pack Up FPU Series Figure 7 1 4 EWCC End Layout 26...

Страница 56: ...Field Pack Up FPU Series...

Страница 57: ...Field Pack Up FPU Series Figure 7 1 5 CCC Load Center Layout 27...

Страница 58: ...Field Pack Up FPU Series...

Страница 59: ...Figure 7 1 6 CCC and EWCC Power Phase Hook Up Ground Rod Black Wire Lien 1 Black Red Wire Line 2 Black White Wire Neutral Green Wire Ground Black Wire Line 1 Black Red Wire Line 2 Black White Wire Ne...

Страница 60: ...Field Pack Up FPU Series 28...

Страница 61: ...Field Pack Up FPU Series...

Страница 62: ...Field Pack Up FPU Series Figure 7 1 7 CCC and EWCC Communications Layout 29...

Страница 63: ...SECTION VIII CCC and EWCC PARTS LISTS...

Страница 64: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 65: ...Series SECTION VIII CCC and EWCC PARTS LIST 8 1 Replacement Parts List Table 8 1 1 Replacement Parts List The BOH CAGE Code is 1NSG3 PAGE FIG ITEM CAGE PART NUMBER EWCC CCC HVAC Model EM18 Twin Temp...

Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 67: ...SECTION IX CCC and EWCC WARRANTY...

Страница 68: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 69: ...void if the Product has at any time been stored or used other than in accordance with the directions set out in the literature relating to the Product BOH makes no other warranty or representation co...

Страница 70: ...eld Pack Up Units FPU Series www bohfpusystems com BOH Environmental LLC FPU Mobility Systems Division 14520 Avion Pkwy Ste 220 Chantilly VA 20151 BOH FPU Systems Telephone 703 449 6020 Fax 703 449 60...

Отзывы: