
Buffer Tank | 5
TANK PLACEMENT
1.
Make sure the buffer tank is on a solid foundation. Use a level measuring instrument.
2.
When a milk pipeline is placed at 30cm above the ground, there must be no walking
space between the buffer and the main tank.
3.
The buffer tank should be located nearby or above the drain.
4.
The best position to install your buffer tank is in front of the main tank. The distance
between the main tank and the buffer tank should be as short as possible. This will re-
duce operating costs and contributes to the deflate process.
AIR SUPPLY
A 6mm airline should be connected from the compressor to the valve block in the CRS+. 4mm airlines
must be connected to the butterfly valves underneath the buffer tank. The air pressure should be be-
tween 6 and 8 bars, to control the butterfly valves.
N.B.
The air pressure to the butterfly valves should not be more than 8bar.
CLEANING
Clean the robot a couple of hours before using the buffer tank. When you do not do this, the robot
may proceed with the main cleaning process when the milk tank driver empties to the main tank.
En
glish
MOUNTING INSTRUCTIONS
Содержание 1000
Страница 3: ...Buffer Tank 3 1 2 ...
Страница 13: ...Buffer Tank 13 English PERSONAL NOTES ...
Страница 14: ...Buffer Tank 14 PERSONAL NOTES English ...
Страница 16: ...Buffer Tank 16 Antennestraat 38 1322 AE Almere The Netherlands www boetech nl www boetechmeps com ...