BOETECH 1000 Скачать руководство пользователя страница 1

Buffer Tank |  1

 

 

BUFFER TANK

 

Mounting Instructions

 

Buffer tank st./w. model 150

 

Buffer tank st./w. model 250

 

Buffer tank st./w. model 350

 

Buffer tank st./w. model 500

 

Buffer tank st./w. model 650

 

Buffer tank st. model 800

 

Buffer tank st. model 1000

 

Buffer tank st. model 1200

 

Buffer tank st. model 1600

 

Содержание 1000

Страница 1: ...tions Buffer tank st w model 150 Buffer tank st w model 250 Buffer tank st w model 350 Buffer tank st w model 500 Buffer tank st w model 650 Buffer tank st model 800 Buffer tank st model 1000 Buffer tank st model 1200 Buffer tank st model 1600 ...

Страница 2: ...een manufactured under rigid inspection and quality ma nagement We ask you to contact your sales department in case of a lack of clarity The type and the serial number of the buffer tank system are attached to the buffer valve system Always include the type and the serial number of your product when you contact your local Lely service provider or when ordering spare parts We suggest that you compl...

Страница 3: ...Buffer Tank 3 1 2 ...

Страница 4: ...EPDM seal 1 100121 1 x EPDM seal 1 5 100122 3 x Tri Clamp seal DN 20 201079 1 x Tri Clamp seal 2 201072 1 x Silicone seal levelsensor 203021 214517 5 x EPDM seal 1 100121 1 x EPDM seal 1 5 100122 5 x Tri Clamp seal DN 20 201079 1 x Tri Clamp seal 2 201072 1 x Silicon seal levelsensor 203021 214514 3 x EPDM seal DN25 100123 1 x EPDM seal 1 5 100122 3 x Tri Clamp seal DN25 720201 1 x Tri Clamp seal ...

Страница 5: ...hort as possible This will re duce operating costs and contributes to the deflate process AIR SUPPLY A 6mm airline should be connected from the compressor to the valve block in the CRS 4mm airlines must be connected to the butterfly valves underneath the buffer tank The air pressure should be be tween 6 and 8 bars to control the butterfly valves N B The air pressure to the butterfly valves should ...

Страница 6: ...nk unless you tighten the locknuts This may result in damage to the leveling feet Ensure that the buffer tank is stable 5 Mount the air in outlet white elbow on the top of the buffer tank Make sure this part is open and clean at all times To make sure the buffer tank will not fall over we recom mend attaching the cleaning pipe to a wall 6 Make the tube pipe connections according to the illustratio...

Страница 7: ...crease the pressure High bacteria count number Insufficient cleaning of the robot main tank or buffer tank First check your robot cleaning then sprin kle ball Check for congestion in the tank valve system INTEDED USE English Description A B C 150 Standing model 150 Wall model 60 cm 50 cm 150 cm 150 cm 180 cm 180 cm 250 Standing model 250 Wall model 60 cm 50 cm 230 cm 230 cm 260 cm 260 cm 350 Stand...

Страница 8: ...milk will get drained to the sewer 4 360 90 min An alarm is generated when the set time is ex ceeded Buffer emptying time The maximum time to allow the buffer tank to transport the milk to the milk tank This is based on a full buffer tank 3 60 60 min The drain time depends on The location of the buffer tank concern ing the milk tank The amount of milk in the milk tank A sensor can be connected to ...

Страница 9: ...e CONNECTION LEVEL SENSOR TO CRS OR CRS M3 The sensor can be connected to an input of the CRS or CRS M3 Configure the setting BV is EMPTY BV1 at configuration inputs At test inputs the state of the level sensor can be checked Check the functioning of the system at the first milk collection Check the wiring if the empty tank procedure does not work well Valve plug M12 CRS CRS M3 1 Blue GND 2 Brown ...

Страница 10: ...ied e g incorrect wiring Fault device failure error cannot be rectified e g electronic error Malfunction Possible cause Corrective action Green LED Unlit No power supply Check connector cable and power supply Red LED Flashing Overload or short circuit in load circuit Rectify short circuit Reduce maximum load current to below 250 mA Red LED Lit Internal sensor failure or sensor corroded Replace dev...

Страница 11: ... possible In this situation the system will work optimal MAX PRESSURE 1 1 2 bar 203001 Electrical acted 3 2 valve This switchbox can be used for Boetech switchbox CRS CRS M3 With a Boetech switchbox the blow valve is con nected on terminals 37 38 With CRS and CRS M3 a digital output Boetech air has to be configured English APPENDIX C PRESSURE SYSTEM Pressure Air outlet Air inlet ...

Страница 12: ...Pneumatic acted 3 2 valve This switchbox can be used for CRS M3 With CRS M3 a pneumatic output Boetech air has to be configured Pressure Air outlet Air inlet 4mm air output CRS Boetech air APPENDIX C PRESSURE SYSTEM English ...

Страница 13: ...Buffer Tank 13 English PERSONAL NOTES ...

Страница 14: ...Buffer Tank 14 PERSONAL NOTES English ...

Страница 15: ...ed with the greatest possible care Boetech Meps Int B V cannot accept liability for any damage that might arise from errors or omissions in this publication The English language manual is the original manual Translations into other languages use the English language manual as the source document Boetech Meps Int B V accepts no liability for discrepancies between the original English language manua...

Страница 16: ...Buffer Tank 16 Antennestraat 38 1322 AE Almere The Netherlands www boetech nl www boetechmeps com ...

Отзывы: