BOERPLAY PB Parkbank 340 Скачать руководство пользователя страница 6

LOGBOOK 

Inspection and maintenance intervals 

Nr. 

Inspection 

Maintenance 

months 

between 

inspections 

Verify equipment's stability, junctions and missing parts. 
Inspect bolts, screws and nuts for absence, jams, corrosion 
and wear. 

Add missing parts, secure joints, apply missing fixing 
agent and replace corroded parts. 

Check suspension for wear. 

Replace worn parts and/or remove non-functioning 
parts. 

Inspect rotating parts such as hinges, rolling-element 
bearings, etc. for wear and acceptability. 

Replace worn parts and/or remove non-functioning 
parts. 

Check wood for splinters, unacceptable damage and signs of 
rot. Especially at ground level. 

Repair damage. Replace affected wood. Smoothen 
splintered wood and sharp edges. 

Inspect foundation for stability, tearing and coverage. 

Restore foundation and covering material. 

Examine rubber and synthetic parts for wear, damage and 
break. 

Replace original parts. 

Inspect metal for corrosion and damage in the coating. 

Restore any damaged coating (after removing rust and 
applying primer). 

Check ropes, cables, chains and nets for wear and damage. 
Steel cables and nets which are tensioned must be checked 
for tension. 

Replace parts where necessary. Steel cables and nets 
must be tensioned. 

Inspect equipment for unsafe changes and additions. 

Remove unsafe additions and correct unsafe changes. 

10 

Inspect safety surfaces. 

Restore and repair where necessary. 

Remarks 

1.

 

If used intensively, all points require extra attention.  

2.

 

Extreme weather conditions and locations may require a higher inspection frequency. Discuss this with 
the supplier. 

3.

 

Vandalism-sensitive locations require stricter inspections, possibly daily.  

4.

 

Check the terrain regularly for items that do not belong there, are unsafe or may be used wrongly. 
Examples are poisonous plants, glass shards, etc. Frequency depends on strain. 

5.

 

Remember that bad maintenance leads to unsafe conditions and notably faster impoverishment of the 
playground area.  

6.

 

Replacement parts can be ordered at the manufacturer with the part numbers on the module drawing. 
Drawings can be found in de user guide. 

7.

 

The impact area shall be provided with impact attenuating surface according to the specified falling 
height. 

8.

 

This list is conform the CEN-standard "playground equipment and surfacing NEN-EN 1176-7".  

Содержание PB Parkbank 340

Страница 1: ...PKNE103 400 Park bench...

Страница 2: ...Benaming Title Opmerking Comment Datum Date Tekening Drawing TOE PKN 103 400 Parkbank Rebo 22 10 2015 BOER SPEELTOESTELLEN Hoofdafmetingen Main dimensions 0 85 m 0 43 m 0 67 m 2 00 m...

Страница 3: ...Benaming Title Opmerking Comment Datum Date Tekening Drawing TOE PKN 103 400 Parkbank Rebo 22 10 2015 BOER SPEELTOESTELLEN Bodemplan Groundplan 0 82 m 0 29 m 1 12 m 0 29 m 0 41 m...

Страница 4: ...n volgens het bodemplan 2 Plaats tafel 3 Controleer of het toestel voldoet aan de afmetingen zoals op blad afmetingen 4 Dicht de gaten en verdicht het zand Controles 1 Correcte opbouw en alle bevestig...

Страница 5: ...truction 2017 Certificate 0183402366 inspection authority NVT Name manufacturer BOERplay Hyacintstraat 2 4255 HX Nieuwendijk Phone 31 0 183 40 23 66 Fax 31 0 183 40 35 64 name installer Description of...

Страница 6: ...pes cables chains and nets for wear and damage Steel cables and nets which are tensioned must be checked for tension Replace parts where necessary Steel cables and nets must be tensioned 3 9 Inspect e...

Страница 7: ...estel is geen speeltoestel conform het warenwetbesluit attractie en speeltoestellen en is dus niet als zodanig gecertificeerd This equipment is not playground equipment so it has not been certified as...

Страница 8: ...8 1 M10 x 160 VZ 8 8 Slotbout 160 010 026 BSV 2 2 M10 x 140 VZ 8 8 Slotbout 140 010 026 BSV 2 3 M10 x 110 VZ 8 8 Slotbout 110 010 026 BSV 2 4 M10 x 100 VZ 8 8 Slotbout 100 010 026 BSV 2 5 M10 VZ 8 8...

Отзывы: