BOERPLAY Adventure Play PSTE000.152 Скачать руководство пользователя страница 8

 

 

Inspection and maintenance intervals 

 

Nr.  Inspection 

Maintenance 

months 

between 

inspections 

Verify equipment's stability, junctions and 
missing parts. Inspect bolts, screws and nuts for 
absence, jams, corrosion and wear. 

Add missing parts, secure joints, apply 
missing fixing agent and replace 
corroded parts. 

Check suspension for wear. 

Replace worn parts and/or remove non-
functioning parts. 

Inspect rotating parts such as hinges, rolling-
element bearings, etc. for wear and acceptability. 

Replace worn parts and/or remove non-
functioning parts. 

Check wood for splinters, unacceptable damage 
and signs of rot, especially at ground level. 

Repair damage. Replace affected wood. 
Smoothen splintered wood and sharp 
edges. 

Inspect foundation for stability, tearing and 
coverage. 

Restore foundation and covering 
material. 

Examine rubber and synthetic parts for wear, 
damage and breakage. 

Replace for OEM original parts. 

Examine fibre reinforced plastic parts, especially 
slides, for wear.  

Replace for OEM parts if the fibres are 
visible. 

Inspect metal for corrosion and damage in the 
coating. 

Restore any damaged coating (after 
removing rust and applying primer). 

Check ropes, cables, chains and nets for wear 
and damage. Steel cables and nets which are 
tensioned must be checked for tension. 

Replace parts where necessary. Steel 
cables and nets must be tensioned. 

10 

Inspect equipment for unsafe changes and 
additions. 

Remove unsafe additions and correct 
unsafe changes. 

11 

Inspect safety surfaces. 

Restore and repair where necessary. 

 

Remarks 

1.

 

If used intensively, all points require extra attention.  

2.

 

Extreme weather conditions and locations may require a higher inspection frequency. Discuss this with the 

supplier. 

3.

 

Vandalism-sensitive locations require stricter inspections, possibly daily.  

4.

 

Re-tighten all connections in Robinia equipment two months after first use.  

5.

 

Re-span spatial networks two months after first use.  

6.

 

Check the terrain regularly for items that do not belong there, are unsafe or may be used wrongly. Examples 

are poisonous plants, glass shards, etc. Frequency depends on strain. 

Содержание Adventure Play PSTE000.152

Страница 1: ...Climbing rope PSTE000 152 Powered by TCPDF www tcpdf org...

Страница 2: ...Benaming Title Opmerking Comment Datum Date Tekening Drawing TOE PST 000 152 Laag parcours Adventure Play 2 6 2020 Hoofdafmetingen Main dimensions 0 00 m 1 10 m 1 27 m 2 99 m 3 60 m 0 00 m 3 80 m...

Страница 3: ...rking Comment Datum Date Tekening Drawing TOE PST 000 152 Laag parcours Adventure Play 2 6 2020 Obstakelvrije zone Obstacle free zone Obstakelvrije zone Obstacle free zone Opvangzone Impact area R 1 5...

Страница 4: ...te Tekening Drawing TOE PST 000 152 Laag parcours Adventure Play 2 6 2020 Bodemplan Groundplan 0 60 m 2 10 m 1 00 m 0 40 m 0 40 m 1 60 m 3 00 m 1 60 m 1 60 m 1 60 m 0 80 m Grondmarkering Ground level...

Страница 5: ...en 3 4 Controleer of het toestel voldoet aan de afmetingen zoals op blad afmetingen 5 Dicht de gaten en verdicht het zand Controles 1 Correcte opbouw en alle bevestigingsmiddelen 2 Controleer de afme...

Страница 6: ...he playground Name _______________________________________________________ Address _______________________________________________________ Zipcode and city ____________________________________________...

Страница 7: ...tion maintenance Time of inspection maintenance Name executor of inspection Name executor of maintenance Found defects Parts to be replaced Accidents Date accident Age of victim Probable cause of inju...

Страница 8: ...c parts especially slides for wear Replace for OEM parts if the fibres are visible 6 8 Inspect metal for corrosion and damage in the coating Restore any damaged coating after removing rust and applyin...

Страница 9: ...nd gravel bark woodchips up to 3000mm height of fall Layer thickness is height of fall 10 100mm with a minimum of 300mm Synthetic surfaces Rubber tiles artificial turf wetpour tigermulch etc height of...

Страница 10: ...A Opmerking Benaming Rev Bew Volgnr Progr Type Nr M12 BORGMOER 012 012 010 BSR 2 1 M12 RVS A2 70 Sluitring 003 012 030 BSR 2 2 5 MM RVS D sluiting 000 005 031 BSR 2 3 Dop zwart Beschermdop M10 M12 060...

Страница 11: ...2m betonvoet Adventure Play 29 7 2016 BOER SPEELTOESTELLEN Samenstelling module Assembly module Opmerking Benaming Rev Bew Volgnr Progr Type Nr Lengte 2000 Paal 14 16 020 160 PST OHO 1 1 80x80x30 cm...

Страница 12: ...betonvoet Adventure Play 6 11 2017 Samenstelling module Assembly module Opmerking Benaming Rev Bew Volgnr Progr Type Nr Lengte 2500 Paal 14 16 025 160 PST OHO 1 1 80x80x30 cm Beton stort 030 080 STO...

Отзывы: