P3,P4,P6,P7
P3
P4
P7
P6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
STEP 4
Assemble Cable and Pulleys as shown
9
P1
P9
P2
P3
P4
P6
P8
P7
P9
51
P1,P2
P2
P1
69
36
36
53
63
36
63
36
69
69
63
63
6R
P5
36
53
69
18
71
P8
69
1
53
36
1. Insert the Bolt End of the Cable (27) through Rotating Pulley Holder (17)
as Figure P1, P2, route over the two pulleys mounted on the Right Top
Frame (6R) as Figure P3, P4. Then go down and around the Pulley
Block (18) on the top plate as Figure P5.
2. Route the cable up and over two pulleys mounted on the Right Top
Frame (6R) as Figure P6, P7, then down to the pulley mounted at the
Base Frame Leg (1) as Figure P8, and up to screw on the bracket at the
Right Pulley Height Adjuster (15R) as Figure P9.
3. Perform the same procedure for the Left side.
Cable (27)
Ball End
Bolt End