Product Assembly
S
TEP 1b: Back Support Frame
1st:
Slide the
BACK SUPPORT FRAME -
Assembly (2-ASM) to the Main Frame -
Assembly (1-ASM) then secure using:
●
One HEX BOLT, 1/2" X 4-1/2" (12)
●
Two FLAT WASHERS, 1/2" (14)
●
One NYLON NUT, THICK, 1/2" (9)
2nd:
Then secure SLEEVE (5) to the BACK
SUPPORT FRAME - Assembly (2-ASM) using:
●
One HEX BOLTS, 3/8" X 4-3/4" (13)
●
Two FLAT WASHERS, 3/8" (15)
●
One NYLON NUT, 3/8" (10)
S
TEP 1c: “Torque Time”
Tighten all Step 1a & Step 1b Bolts &
Nuts at this time to the Recommended
Torque Specs of 20 ft-lbs.(+/- 2 lbs)
20 ft-lbs
(+/- 2 lbs)
3/4 SOCKET &
6” EXTENSION
3/4 WRENCHES
Recommended Tools
TIP:
Fully tighten HEX BOLT (12), then
loosen its locking Nylon Nut, Thick (9)
up to 1/4 turn so that BACK SUPPORT
FRAME - Assembly (4-ASM) & BASE
FRAME - Assembly (1-ASM) pivot
freely, without excessive movement.
S
TEP 1a: Main Frame
Attach REAR STABILIZER - Assembly (4-ASM) to the MAIN FRAME - Assembly (1-ASM) using:
●
Two HEX BOLTS, 1/2" X 4-1/4" (11)
●
Four FLAT WASHERS, 1/2" (14)
●
Two NYLON NUTS, THICK, 1/2" (9)
Please Hand Tighten All Bolts Until End of STEP 3
8
Содержание F703
Страница 11: ...Parts Exploded View 11...
Страница 13: ...Heart Rate Monitoring Device Exercise Tips 13...
Страница 16: ......